Advertisement

Quick Links

Installation
Manual
BKH 5.0 Eck/corner
42-98-42
©2024

Advertisement

Table of Contents
loading

Summary of Contents for Brunner BKH 5.0 Eck/corner 42-98-42

  • Page 1 Installation Manual BKH 5.0 Eck/corner 42-98-42 ©2024...
  • Page 2: Table Of Contents

    10.3 Cast iron dome..........................61 10.4 Heat exchanger rings........................64 10.5 Heat exchanger MAS........................73 Conversions, settings....................79 11.1 Modification - lifting door: “non self closing”................79 Disposal........................80 Technical data......................81 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 3: Basic Informations

    Please notify your supplier of any damage which might have occurred during transport. Please keep these instructions. Please also take note of the online product documentation provided General instructions of the Brunner products installation for the stove construction. (https://www.brunner.de/produktdownloads/kacheloefen-kamine/allge- meine-hinweise-fuer-den-aufbau_de.pdf) laden können.
  • Page 4: Specified Symbols

    There is a certain risk, which can lead to a malfunction or damage of the related system and all devices connected with it, if the indicated notifications are not followed. Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 5 NOTE Additional helpful information © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 6: Delivery Contents Bkh Eck/Corner 42-98-42

    DELIVERY CONTENTS BKH ECK/CORNER 42-98-42 BKH Eck/corner 42-98-42 ST with lifting door - left side or right side - mounting frame 60 mm Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 7 BKH 5.0 Eck/corner 42-98-42 STL for EAS/EOS with Glass ceramic coated (GKB) Chamotte inner ling- HK026002-06 ing (FR) BKH 5.0 Eck/corner 42-98-42 STL with manual operation, with Ceramic glass (GK) Cast iron inner lining HK026002-03 (FR/Guss) BKH 5.0 Eck/corner 42-98-42 STL with manual operation, with Glass ceramic coated (GKB) Cast iron...
  • Page 8: Catalytic Converter (Optional)

    This catalytic converter is suitable for all BKH units (with lifting door, with side opening door, tunnel, with cast dome, with heat exchanger cast rings and MAS). This catalytic converter can also be retrofitted. Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 9: Air Connection Box (Optional)

    Clamping plate for fixing the external combustion air line on the side Floor clamping plate for fixing the external combustion air line to the floor *both clamp plates are supplied, but only the appropriate one is used. © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 10: Safety Distances Bkh Eck/Corner

    (accessories) non-combustible flooring /floor protection pane All figures in cm When designing the exhaust system and exhaust pipe, national standards and fire protection regulations must be observed Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 11 (accessories) non-combustible flooring /floor protection pane All figures in cm When designing the exhaust system and exhaust pipe, national standards and fire protection regulations must be observed © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 12: Setting Up

    As long as the device is on the wooden pallet, it can be transported with a hand truck or forklift as usual. REMOVE THE TRANSPORT LOCKS 6.1.1 VARIANT BKH ECK/CORNER ST (LIFTING DOOR) Remove the transport lock! Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 13: Set Up The Fireplace

    SET UP THE FIREPLACE Summarised information: BHK with lifting door Workflow: © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 14 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 15: Variant With External Combustion Air Connection

    VARIANT WITH EXTERNAL COMBUSTION AIR CONNECTION Preparatory work Workflow: © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 16 - using aluxflex on 3 lateral parts (S) and al- so from the bottom (B). Once you have made a decision, break out the ap- propriate part and make the connections for the air supply. Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 17: Bottom Connection (B)

    6.3.1 BOTTOM CONNECTION (B) Im. 2: Summarised information Workflow: © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 18 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 19 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 20 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 21 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 22 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 23: Side Connection Bkh Eck/Corner

    6.3.2 SIDE CONNECTION BKH ECK/CORNER Im. 3: Summarised information Workflow: © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 24 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 25 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 26 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 27 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 28: Variant With Eas Or Eos

    VARIANT WITH EAS OR EOS R / L R / L Im. 4: Summarised information Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 29 (230VAC) before starting work. Wait until the drive has been fully powered up via the battery of the control unit (max- imum running time 2 minutes). Workflow: © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 30 Make the electrical connection Variants: cable routing right side or left side Im. 6: cable routing left side Im. 5: cable routing right side Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 31 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 32 INFO: Access Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 33 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 34 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 35 Variants cable routing - Thermocouple: right side or left side right side: left side: © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 36 Do not overtighten the screws! Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 37 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 38 Variant: Ther- mocouple right side Variant: Ther- mocouple left side Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 39: Fitting: Catalytic Converter

    FITTING: CATALYTIC CONVERTER Im. 7: Summarised information catalytic converter 2a+2b assembly tool © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 40 Workflow: Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 41 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 42 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 43: Fitting: Deflection - Combustion Chamber

    FITTING: DEFLECTION - COMBUSTION CHAMBER Summarised information: Support points for the deflector plates : Mounting - detailed: © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 44 Workflow: Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 45 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 46 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 47 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 48 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 49 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 50 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 51 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 52 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 53 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 54: Variants Heat Exchanger

    VARIANTS HEAT EXCHANGER 10.1 CONNECTION WITH CATALYTIC CONVERTER Mounting catalytic converter: “ Fitting: catalytic converter” Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 55: Connection Without Catalytic Converter

    10.2 CONNECTION WITHOUT CATALYTIC CONVERTER Possible variants of the connection for the outlet of flue gases Position: cast iron dome - deflector plate © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 56 Examples for the position of the deflector plate : Connection variant for exhaust gases: 1) Example A: with rotating cast iron dome - at rear - vertical 2) Example B: with rotating cast iron dome - at rear - horizontal Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 57 3) Example C: with rotating cast iron dome - left side - vertical or horizontal © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 58 4) Example D: with rotating cast iron dome with heat exchanger ring - at rear - vertical or horizontal Principle of flue gas routing with heat exchanger rings Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 59 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 60 5) Example F: with rotating cast iron dome with cast iron heat exchanger rings - to the left vertical or horizontal Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 61: Cast Iron Dome

    10.3 CAST IRON DOME vertical outlet horizontal outlet INFO modification: see enclosed sheet - cast iron dome Summarised information: © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 62 Workflow: Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 63 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 64: Heat Exchanger Rings

    10.4 HEAT EXCHANGER RINGS Im. 8: Summarised information Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 65 Workflow © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 66 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 67 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 68 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 69 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 70 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 71 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 72 Thereafter: see “Cast iron dome” Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 73: Heat Exchanger Mas

    10.5 HEAT EXCHANGER MAS Im. 9: Summarised information Workflow: © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 74 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 75 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 76 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 77 © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 78 Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 79: Conversions, Settings

    CONVERSIONS, SETTINGS 11.1 MODIFICATION - LIFTING DOOR: “NON SELF CLOSING” Workflow: © 2024 Brunner GmbH Installation Manual BKH Eck/corner 42-98-42 green (1.4)
  • Page 80: Disposal

    Please bring the used cacatalytic converter to a recycling center. Thank you very much for your efforts in supporting the protection of environment and sustainable use of re- sources. Installation Manual BKH Eck/corner 42-98-42 green (1.4) © 2024 Brunner GmbH...
  • Page 81: Technical Data

    Dimension sheets - BKH Eck 42-98-42 green lifting door Ø125 Ø180 /200 1094 1198 … left with mounting frame and Cast iron dome Stand: 2024-02-06...
  • Page 82 Dimension sheets - BKH Eck 42-98-42 green lifting door Ø125 Ø180 /200 1094 1198 … right with mounting frame and Cast iron dome Stand: 2024-02-06...
  • Page 83 Dimension sheets - BKH Eck 42-98-42 green lifting door Ø125 Ø180/200 1094 1198 … left with mounting frame and MAS Stand: 2024-02-06...
  • Page 84 Dimension sheets - BKH Eck 42-98-42 green lifting door Ø125 Ø180/200 1094 1198 … right with mounting frame and MAS Stand: 2024-02-06...
  • Page 85 Dimension sheets - BKH Eck 42-98-42 green lifting door Ø125 Ø180 /200 1094 1198 … left with mounting frame and cast iron heat exchanger rings + dome Stand: 2024-02-06...
  • Page 86 … right with mounting frame and cast iron heat exchanger rings + dome We suggest for CAD planning Palette CAD. Permanent updated drawings: www.brunner.de Frames/ flue gas outlet connection/ combustion air supply connection/ front variants/ support bearing are marked in col-...
  • Page 87 Planning and installation - BKH Eck 42-98-42 green lifting door Tested according to EN 13229 W EN 13229 WA Values measured at Rated power Storage operation Data for functional demonstration Rated heat power 11.0 Fire wood volume kg/h Combustion performance 13.0 Flue gas mass flow 13.0...
  • Page 88 Planning and installation - BKH Eck 42-98-42 green lifting door 7) Heat protection panels (accessories) only available for selected fireplace inserts. For assembly and design of the heat protection panel see assembly instructions. Distance between mounted heat protection panel and fireplace in- sert: rear wall 2 cm, side wall 3 cm.
  • Page 89 Copyright All information, drawings and technical descriptions contained in this documentation are our property and may not be reproduced without prior written permission. ® BRUNNER is a registered trademark. Subject to technical changes and errors. © by Ulrich Brunner GmbH Doku-Nr.: 202969...

Table of Contents