Advertisement

Quick Links

Installation
Manual
BKH 5.0 Eck/corner
42-66-42
©2024

Advertisement

Table of Contents
loading

Summary of Contents for Brunner BKH 5.0 Eck/corner 42-66-42

  • Page 1 Installation Manual BKH 5.0 Eck/corner 42-66-42 ©2024...
  • Page 2: Table Of Contents

    10.5 Heat exchanger MAS........................88 Frame variants......................94 11.1 Door frame (BKH with side-opening door)..................94 Conversions, settings....................97 12.1 Modification - lifting door: “non self closing”................97 Disposal........................98 Technical data......................99 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 3: Basic Informations

    Please notify your supplier of any damage which might have occurred during transport. Please keep these instructions. Please also take note of the online product documentation provided General instructions of the Brunner products installation for the stove construction. (https://www.brunner.de/produktdownloads/kacheloefen-kamine/allge- meine-hinweise-fuer-den-aufbau_de.pdf) laden können.
  • Page 4: Specified Symbols

    There is a certain risk, which can lead to a malfunction or damage of the related system and all devices connected with it, if the indicated notifications are not followed. Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 5 NOTE Additional helpful information © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 6: Delivery Contents Bkh Eck/Corner 42-66-42

    DELIVERY CONTENTS BKH ECK/CORNER 42-66-42 BKH Eck/corner 42-66-42 ST with lifting door - left side or right side - mounting frame 60 mm Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 7 BKH 5.0 Eck/corner 42-66-42 STL for EAS/EOS with Glass ceramic coated (GKB) Chamotte inner ling- HK024002-06 ing (FR) BKH 5.0 Eck/corner 42-66-42 STL with manual operation, with Ceramic glass (GK) Cast iron inner lining HK024002-03 (FR/Guss) BKH 5.0 Eck/corner 42-66-42 STL with manual operation, with Glass ceramic coated (GKB) Cast iron...
  • Page 8 BKH Eck/corner 42-66-42 with side-opening door (DT) - left side or right side - Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 9 BKH 5.0 Eck/corner 42-66-42 DTL with manual operation, with Glass ceramic HK022002-07 coated (GKB) Cast iron inner lining (FR/Guss) BKH 5.0 Eck/corner 42-66-42 DTL for EAS/EOS with Ceramic glass (GK) Cast HK022002-04 iron inner lining (FR/Guss) BKH 5.0 Eck/corner 42-66-42 DTL for EAS/EOS with Glass ceramic coated...
  • Page 10: Catalytic Converter (Optional)

    This catalytic converter is suitable for all BKH units (with lifting door, with side opening door, tunnel, with cast dome, with heat exchanger cast rings and MAS). This catalytic converter can also be retrofitted. Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 11: Air Connection Box (Optional)

    *both clamp plates are supplied, but only the appropriate one is used. HEAT PROTECTION PANEL-DELIVERY CONTENTS BKH ECK/ CORNER Heat protection panel with 1 sidewall (HK021450) 1+2+3*+4+5 heat protection panel additions for BSK *only for: BSK separate package © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 12: Safety Distances Bkh Eck/Corner

    (accessories) non-combustible flooring /floor protection pane All figures in cm When designing the exhaust system and exhaust pipe, national standards and fire protection regulations must be observed Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 13 (accessories) non-combustible flooring /floor protection pane All figures in cm When designing the exhaust system and exhaust pipe, national standards and fire protection regulations must be observed © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 14: Setting Up

    As long as the device is on the wooden pallet, it can be transported with a hand truck or forklift as usual. REMOVE THE TRANSPORT LOCKS 6.1.1 VARIANT BKH ECK/CORNER ST (LIFTING DOOR) Remove the transport lock! Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 15: Variant Bkh Eck/Corner Dt (Side-Opening Door)

    If you use heat protection panels, they should be mounted before positioning the fire- place insert. First mount the heat protection panels, then place the fireplace insert against the wall. Im. 1: Summarised information © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 16 CAUTION Risk of injury from sharp edges! Examples: setting up Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 17: Heat Protection Panel For Bkh Eck/Corner With Side-Opening Door (Dt)

    BKH corner, mirror the drawings of the work steps given below (depending on the DT or ST version). 6.2.1 HEAT PROTECTION PANEL FOR BKH ECK/CORNER WITH SIDE-OPENING DOOR (DT) © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 18 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 19 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 20 BKH + heat protection panel + BSK BKH + heat protection panel A = max. 1395 mm A = max. 1665 mm Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 21 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 22 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 23 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 24: Heat Protection Panel Bkh Eck/Corner Lifting Door (St)

    6.2.2 HEAT PROTECTION PANEL BKH ECK/CORNER LIFTING DOOR (ST) Preparatory work: Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 25 : right side !!! BKH + heat protection panel BKH + heat protection panel + BSK A = max. 1395 mm A = max. 1665 mm © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 26 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 27 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 28 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 29 BSK: © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 30 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 31: Set Up The Fireplace

    SET UP THE FIREPLACE Summarised information: BKH with side-opening door Workflow: © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 32 BHK with lifting door Workflow: Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 33 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 34: Variant With External Combustion Air Connection

    VARIANT WITH EXTERNAL COMBUSTION AIR CONNECTION Preparatory work Workflow: Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 35 - using aluxflex on 3 lateral parts (S) and al- so from the bottom (B). Once you have made a decision, break out the ap- propriate part and make the connections for the air supply. © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 36: Bottom Connection (B)

    6.4.1 BOTTOM CONNECTION (B) Im. 3: Summarised information Workflow: Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 37 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 38 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 39 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 40 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 41 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 42: Side Connection Bkh Eck/Corner

    6.4.2 SIDE CONNECTION BKH ECK/CORNER Im. 4: Summarised information Workflow: Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 43 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 44 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 45 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 46 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 47: Variant With Eas Or Eos

    VARIANT WITH EAS OR EOS R / L R / L Im. 5: Summarised information © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 48 (230VAC) before starting work. Wait until the drive has been fully powered up via the battery of the control unit (max- imum running time 2 minutes). Workflow: Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 49 Make the electrical connection Variants: cable routing right side or left side Im. 7: cable routing left side Im. 6: cable routing right side © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 50 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 51 INFO: Access © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 52 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 53 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 54 Variants cable routing - Thermocouple: right side or left side right side: left side: Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 55 Do not overtighten the screws! © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 56 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 57 Variant: Ther- mocouple right side Variant: Ther- mocouple left side © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 58: Fitting: Catalytic Converter

    FITTING: CATALYTIC CONVERTER Im. 8: Summarised information catalytic converter 2a+2b assembly tool Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 59 Workflow: © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 60 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 61 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 62: Fitting: Deflection - Combustion Chamber

    FITTING: DEFLECTION - COMBUSTION CHAMBER Summarised information: Support points for the deflector plates : Mounting - detailed: Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 63 Workflow: © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 64 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 65 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 66 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 67 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 68 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 69 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 70 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 71 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 72 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 73: Variants Heat Exchanger

    VARIANTS HEAT EXCHANGER 10.1 CONNECTION WITH CATALYTIC CONVERTER Mounting catalytic converter: “ Fitting: catalytic converter” © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 74: Connection Without Catalytic Converter

    10.2 CONNECTION WITHOUT CATALYTIC CONVERTER Possible variants of the connection for the outlet of flue gases Position: cast iron dome - deflector plate Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 75 Examples for the position of the deflector plate : Connection variant for exhaust gases: 1) Example A: with rotating cast iron dome - at rear - vertical 2) Example B: with rotating cast iron dome - at rear - horizontal © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 76 3) Example C: with rotating cast iron dome - left side - vertical or horizontal Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 77 4) Example D: with rotating cast iron dome with heat exchanger ring - at rear - vertical or horizontal Principle of flue gas routing with heat exchanger rings © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 78 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 79 5) Example F: with rotating cast iron dome with cast iron heat exchanger rings - to the left vertical or horizontal © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 80: Cast Iron Dome

    10.3 CAST IRON DOME vertical outlet horizontal outlet INFO modification: see enclosed sheet - cast iron dome Summarised information: Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 81 Workflow: © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 82 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 83: Heat Exchanger Rings

    10.4 HEAT EXCHANGER RINGS Summarised information: Workflow: © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 84 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 85 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 86 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 87 Thereafter: see “Cast iron dome” © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 88: Heat Exchanger Mas

    10.5 HEAT EXCHANGER MAS Im. 9: Summarised information Workflow: Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 89 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 90 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 91 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 92 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 93 © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 94: Frame Variants

    FRAME VARIANTS 11.1 DOOR FRAME (BKH WITH SIDE-OPENING DOOR) Im. 10: Summarised information Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 95 Workflow: © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 96 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 97: Conversions, Settings

    CONVERSIONS, SETTINGS 12.1 MODIFICATION - LIFTING DOOR: “NON SELF CLOSING” Workflow: © 2024 Brunner GmbH Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6)
  • Page 98: Disposal

    Please bring the used cacatalytic converter to a recycling center. Thank you very much for your efforts in supporting the protection of environment and sustainable use of re- sources. Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...
  • Page 99: Technical Data

    Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180 /200 … left with mounting bracket and cast iron dome (side-opening door, DT) Stand: 2024-02-06...
  • Page 100 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180 /200 … right with mounting bracket and cast iron dome (side-opening door, DT) Stand: 2024-02-06...
  • Page 101 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180 /200 … left with door frame and cast iron dome (side-opening door, DT) Stand: 2024-02-06...
  • Page 102 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180 /200 … right with door frame and cast iron dome (side-opening door, DT) Stand: 2024-02-06...
  • Page 103 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180 /200 … left with mounting frame and cast iron dome (lifting door, ST) Stand: 2024-02-06...
  • Page 104 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180 /200 … right with mounting frame and cast iron dome (lifting door, ST) Stand: 2024-02-06...
  • Page 105 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180/200 … left with mounting bracket and MAS (side-opening door, DT) Stand: 2024-02-06...
  • Page 106 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180/200 … right with mounting bracket and MAS (side-opening door, DT) Stand: 2024-02-06...
  • Page 107 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180/200 … left with door frame and MAS (side-opening door, DT) Stand: 2024-02-06...
  • Page 108 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180/200 … right with door frame and MAS (side-opening door, DT) Stand: 2024-02-06...
  • Page 109 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180/200 … left with mounting frame and MAS (lifting door, ST) Stand: 2024-02-06...
  • Page 110 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180/200 … right with mounting frame and MAS (lifting door, ST) Stand: 2024-02-06...
  • Page 111 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180 /200 … left with mounting bracket and cast iron heat exchanger rings + dome (side-opening door, DT) Stand: 2024-02-06...
  • Page 112 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180 /200 … right with mounting bracket and cast iron heat exchanger rings + dome (side-opening door, DT) Stand: 2024-02-06...
  • Page 113 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180 /200 … left with door frame and cast iron heat exchanger rings + dome (side-opening door, DT) Stand: 2024-02-06...
  • Page 114 Dimension sheets - BKH Eck 42-66-42 green Ø125 Ø180 /200 … right with door frame and cast iron heat exchanger rings + dome (side-opening door, DT) Stand: 2024-02-06...
  • Page 115 … right with mounting frame and cast iron heat exchanger rings + dome (lifting door, ST) We suggest for CAD planning Palette CAD. Permanent updated drawings: www.brunner.de Frames/ flue gas outlet connection/ combustion air supply connection/ front variants/ support bearing are marked in col-...
  • Page 116 Planning and installation - BKH Eck 42-66-42 green Tested according to EN 13229 W EN 13229 WA Values measured at Rated power Storage operation Data for functional demonstration Rated heat power Fire wood volume kg/h Combustion performance Flue gas mass flow Flue gas temperature after: Cast iron dome °C...
  • Page 117 Planning and installation - BKH Eck 42-66-42 green 7) Heat protection panels (accessories) only available for selected fireplace inserts. For assembly and design of the heat protection panel see assembly instructions. Distance between mounted heat protection panel and fireplace in- sert: rear wall 2 cm, side wall 3 cm.
  • Page 118 All information, drawings and technical descriptions contained in this documentation are our property and may not be reproduced without prior written permission. ® BRUNNER is a registered trademark. Subject to technical changes and errors. © by Ulrich Brunner GmbH Doku-Nr.: 202968 Installation Manual BKH 5.0 Eck/corner 42-66-42 green (1.6) © 2024 Brunner GmbH...

Table of Contents