SHIFT LEVER LOAD ADJUSTMENT
Shift lever load adjustment is made by screwing the two 8 mm
nuts in or out.
1) Move th shift lever to the "FORWARD" position fully.
2) Screw the 8 mm nut in so the shift lever load is within the
following specification.
SHIFT lEVER toAD: 3.0- 5.0 kg (6.6- 11.0
lbJ
After adjustment tighten the 8 mm nut securely.
NOTE·
•
The shift lever may move
if
the shift lever load Is under the
specification.
Measure the load as shown in the illustration.
•
Adjust the shift cable after this adjustment (P.14-12)
CHUTE GUIDE LEVER LOAD ADJUSTMENT
Chute guide lever load adjustment is made by screwing the two 8
mm nuts in or out.
1)
Move the chute guide lever to the "UP" position.
2) Screw the 8 mm nut in so the chute guide lever load is within
the following specification.
CHUTE GUIDE LEVER LOAD: 6.0- 7.0 kg {13- 15
lb)
After adjustment. tighten the 8 mm nut securely.
NOTE·
• The chute guide lever may move if the chute guide lever
load is under the specification.
Measure the load as shown in the illustration.
•
Adjust the chute guide cble after this adjustment (P.3-5).
HS9Z8
OPERATOR SIDE
8 mm NUT
HONDA.
HSB2B
8 mm NUT
30mm
{1.2 in)