Heat & Glo TRUE-36G-IFT Installation Manual page 15

Hide thumbs Also See for TRUE-36G-IFT:
Table of Contents

Advertisement

B
D
NOTE: 2 X 4 Header positioned vertically. See also Figure 3.7.
Inches
TRUE-36-IFT
Millimeters
Inches
TRUE-42-IFT
Millimeters
Inches
TRUE-50-IFT
Millimeters
* Adjust framing dimensions for interior sheathing (such as sheetrock).
** For installations with vinyl 昀氀ooring, see Section 3E.
Figure 3.8 Clearances to Combustibles (2 X 4 Construction)
Heat & Glo • TRUE-36-IFT, TRUE-42-IFT, TRUE-50-IFT Installation Manual • 2461-980 Rev. Y • 6/23
A
C
* MINIMUM FRAMING DIMENSIONS USING 2 X 4 CONSTRUCTION
A
B
C
Rough
Rough
Rough
Opening
Opening
Opening
(Vent Pipe)
(Height)
(Depth)
10
56
24
254
1422
610
10
61
24
254
1549
610
10
65
24
254
1651
610
F
G**
J
D
E
F
Rough
Clearance
Combustible
Opening
Floor
to Ceiling
(Width)
59-1/2
52
0
1511
1321
0
65-9/16
52
0
1665
1321
0
73-9/16
52
0
1868
1321
0
E
(FROM APPLIANCE
OPENING TO CEILING)
H
I
G**
H
I
Sides of
Combustible
Behind
Appli-
Flooring
Appliance
ance
1
1
25
25
1
1
See Sec-
tion 3.D.
25
25
1
1
25
25
J
Front of
Appliance
36
914
36
914
36
914
15

Advertisement

Table of Contents
loading

Table of Contents