switched off. Therefore, equipment shall not be serviced or
operated until 60 minutes after all inputs are switched off.
For grid connection only!
This inverter is specially designed for directly connecting AC
power to public power grid. Do not connect the AC output of
this equipment directly to private AC power equipment.
High temperature:
This product complies with the international safety standard,
but the inverter would generate heat during operation. So do
not touch the metal surfaces of the radiator and inverter
during the operation of the inverter.
2
Chapter 1 Safety Instructions
Need help?
Do you have a question about the CPS Series and is the answer not in the manual?