Mitsubishi Electric AE-200A/AE-50A Instruction Book page 43

Air conditioning control system
Table of Contents

Advertisement

(1-4) Selecting all groups as a target
Select [All Groups] in the Setting Range section.
If different equipment types exist together in the same system, a screen to
select an equipment type will appear.
Click one of the equipment types to set the schedule.
A Schedule Settings screen will appear.
To create a schedule for the given groups from scratch, click the radio
button next to [New settings] and click [OK].
To create a schedule based on the existing setting of another group, click
the radio button next to [Based on the following group settings], select the
name of the group whose schedule is to be based on, and click [OK]. The
contents of the schedule that have been set for the selected group will
appear in the Contents of Schedule section.
(2) Setting the date periods
Click [Edit] in the Seasonal settings section.
Enter the date periods in which each weekly schedule will be effective.
Check the checkboxes on the left side to enable each weekly schedule.
Note: If the [Schedule: Season setting] setting is set to [Not Available], the [Edit]
button will not appear, and seasonal settings cannot be made. The [Schedule:
Season setting] setting can be set on the Basic System settings screen,
accessible via the Web Browser for Initial Settings.
Note: When any of the Weekly Schedules 1, 2, 3, 4, and 5 overlap, the schedule
with the lower number takes priority. For example, Weekly Schedule 1 takes
precedence over Weekly Schedule 5.
Note: The date period over the next year (such as 11/01 - 03/31) can be set.
(3) Selecting a day of the week
In the Contents of Weekly Schedule section, select a day to set the
schedule.
WT07139X01
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-200e/ae-50e

Table of Contents