6.3 End covers

End covers are provided to be assembled on the
switchgear at extreme lateral ends of
switchboard
6.4 Laying the inter-switchgear wires
Inter-panel wires are rolled as a bundle and placed
inside the low voltage compartment. They are
marked and fitted with ferrules at both ends.
Provisions are made in sidewalls of the low
voltage compartment for looping between
switchgears.
5.14 Assembly photos
Left side end cover assembly
Figure 56 - End cover assembly
Right side end cover assembly
Figure 57 - Complete cubicle assembly
Figure 58 - Cubicle rear cover assembly