ABB eVD4 Engineering Manual

Breaker integrated protection rbx615

Advertisement

Quick Links

®
Equipped with Relion
technology
eVD4
Breaker Integrated Protection RBX615
Engineering Guide

Advertisement

Table of Contents
loading

Summary of Contents for ABB eVD4

  • Page 1 ® Equipped with Relion technology eVD4 Breaker Integrated Protection RBX615 Engineering Guide...
  • Page 3 Document ID: 1MRS757255 Issued: 2011-12-13 Revision: B Product version: 2.0 © Copyright 2011 ABB. All rights reserved...
  • Page 4 Copyright This document and parts thereof must not be reproduced or copied without written permission from ABB, and the contents thereof must not be imparted to a third party, nor used for any unauthorized purpose. The software or hardware described in this document is furnished under a license and may be used, copied, or disclosed only in accordance with the terms of such license.
  • Page 5 In case any errors are detected, the reader is kindly requested to notify the manufacturer. Other than under explicit contractual commitments, in no event shall ABB be responsible or liable for any loss or damage resulting from the use of this manual or the application of the equipment.
  • Page 6 Conformity The IED is designed in accordance with the international standards of the IEC 60255 series, EMC Directive 2004/108/EC and MV circuit breaker standard IEC 62271-100.
  • Page 7 Safety information Dangerous voltages can occur on the connectors, even though the auxiliary voltage has been disconnected. Non-observance can result in death, personal injury or substantial property damage. Only a competent electrician is allowed to carry out the electrical installation. National and local electrical safety regulations must always be followed.
  • Page 9: Table Of Contents

    Table of contents Table of contents Section 1 Introduction...............3 This manual..................3 Intended audience................3 Product documentation...............4 Product documentation set............4 Document revision history.............5 Related documentation..............6 Symbols and conventions..............6 Symbols..................6 Document conventions..............6 Section 2 IEC 61850 overview............9 Section 3 PCM600 tool..............11 Connectivity packages..............12 PCM600 and IED connectivity package version.......12 CCT600 ...................13 Section 4 615 series data model............15...
  • Page 10 Table of contents Exporting the SCL file.............32 Importing the SCL file.............33 Connecting GOOSE inputs to an IED application....35 Received GOOSE message handling..........37 GOOSE supervision.................37 Background sending..............37 Default value handling..............38 Alarm supervision in application..........38 Diagnostic counters..............38 Section 6 Required CCT600 project modifications......41 Attaching the IEC 61850 clients to the bus........41 Defining server IEDs.................43 Section 7 Glossary.................45...
  • Page 11: Section 1 Introduction

    Section 1 1MRS757255 B Introduction Section 1 Introduction This manual The engineering guide provides information for IEC 61850 engineering of the 615 series protection IEDs with PCM600 and CCT600. This guide concentrates especially on the configuration of GOOSE communication with these tools. The guide can be used as a technical reference during the engineering phase, installation and commissioning phase, and during normal service.
  • Page 12: Product Documentation

    Section 1 1MRS757255 B Introduction Product documentation 1.3.1 Product documentation set Engineering manual Engineering manual Engineering manual Installation manual Installation manual Installation manual Commissioning manual Commissioning manual Commissioning manual Operation manual Operation manual Operation manual Service manual Service manual Service manual Application manual Application manual Application manual...
  • Page 13: Document Revision History

    IED use. The manual provides instant solutions to the problems that the end used might face while using the IED, both at commissioning and during the eVD4 life. The service manual contains instructions on how to service and maintain the IED.
  • Page 14: Related Documentation

    Introduction Download the latest documents from the ABB Web site http://www.abb.com/mediumvoltage. 1.3.3 Related documentation Product series- and product-specific manuals can be downloaded from the ABB web site http://www.abb.com/mediumvoltage. Symbols and conventions 1.4.1 Symbols The caution icon indicates important information or warning related to the concept discussed in the text.
  • Page 15 Section 1 1MRS757255 B Introduction • LHMI messages are shown in Courier font. To save the changes in non-volatile memory, select Yes and press • Parameter names are shown in italics. The function can be enabled and disabled with the Operation setting. •...
  • Page 17: Section 2 Iec 61850 Overview

    Section 2 1MRS757255 B IEC 61850 overview Section 2 IEC 61850 overview The international IEC 61850 standard defines a framework for substation communications networks and systems. The standard consists of several parts ranging from the requirements on substation automation systems to the details of a communication protocol.
  • Page 18 Section 2 1MRS757255 B IEC 61850 overview The standard also defines a description language for substation automation systems. The language facilitates efficient integration of devices into systems in an automated fashion. Additionally the standard supports a comprehensive and consistent system definition and engineering, which makes not only the devices, but also their tools and systems interoperable (standard part 6).
  • Page 19: Section 3 Pcm600 Tool

    Section 3 1MRS757255 B PCM600 tool Section 3 PCM600 tool Protection and Control IED Manager PCM600 offers all the necessary functionality to work throughout all stages of the IED life cycle. • Planning • Engineering • Commissioning • Operation and disturbance handling •...
  • Page 20: Connectivity Packages

    PCM600 and IED connectivity package version • Protection and Control IED Manager PCM600 Ver. 2.4 or later • RBX615 Connectivity Package Ver. 2.0 or later Download connectivity packages from the ABB web site http:// www.abb.com/substationautomation Breaker Integrated Protection RBX615 Engineering Guide...
  • Page 21: Cct600

    Section 3 1MRS757255 B PCM600 tool CCT600 IEC 61850 also affects the engineering of the devices. PCM600 Engineering Pro includes the communication configuration tool CCT600. CCT600 is used to configure 615 series IEDs for use in IEC 61850 horizontal communication and to edit client and event reporting properties.
  • Page 23: Section 4 615 Series Data Model

    Section 4 1MRS757255 B 615 series data model Section 4 615 series data model 615 series implementation The IEC 61850 communication protocol is always supported by the 615 series IEDs. If the IED is ordered with no Ethernet communication interface, the front port on the device still works according to IEC 61850.
  • Page 24: Vertical And Horizontal Communication

    Section 4 1MRS757255 B 615 series data model Different configurations have different data models. During system engineering in the system configuration tool, do not delete or rename logical devices, logical nodes, data objects or data attributes in IEC 61850 data model. GUID-42167015-6E8C-4707-8E3C-5CCB30BE2BF4 V1 EN Figure 3: Example of an IEC 61850 data model of a 615 series IED...
  • Page 25: Predefined Vertical Communication Data Sets

    Section 4 1MRS757255 B 615 series data model unbuffered reports and execute control sequences. Five separate individual clients are supported. An active PCM600 connection is also considered a client as such. Additionally, the 615 series IEDs can be programmed to publish (send) information to and subscribe (receive) information from other devices according to the IEC 61850-8-1 GOOSE profile.
  • Page 26: Parameter Setting And Disturbance Recorder

    Section 4 1MRS757255 B 615 series data model Table 2: Diagnostic data objects Data object Description Diagnostic information IntIn1 Successful connections Number of succeeded client connection attempts IntIn2 Failed connections Number of failed client connection attempts IntIn3 Concludes Number of session concludes IntIn4 Sent aborts Number of association aborts sent by server...
  • Page 27: Section 5 Goose

    Section 5 1MRS757255 B GOOSE Section 5 GOOSE Horizontal communication GOOSE is used in substation automation for fast horizontal communication between the IEDs. GOOSE can be used for direct data exchange, for example, of interlocking and blocking information between IEDs. According to the IEC 61850-8-1 standard, GOOSE uses a publisher/subscriber profile in which information is shared from one IED to one or several IEDs by using Ethernet multicast messages.
  • Page 28: Goose Publishing Properties

    Section 5 1MRS757255 B GOOSE While configuring take back-ups of the PCM600 and CCT600 projects, for example, before importing an SCD file to the project. PCM600 Export Import Create file CCT600 devices Configure GOOSE publisher and Third party subscriber device Export file Import...
  • Page 29: Configuring Goose

    Section 5 1MRS757255 B GOOSE Table 3: GOOSE control block attributes GoCB attribute Description Multicast address A multicast addressing scheme is used when sending GOOSE messages. A multicast address can be shared by several sending devices, or it can be IED specific. To keep the multicast message filtering of the devices working it is recommended to use unique multicast addresses.
  • Page 30: Creating An Empty Project

    Section 5 1MRS757255 B GOOSE GUID-8510D9CE-3772-4EDA-89B2-DE811B1D7096 V1 EN Figure 5: Exporting an SCD file from PCM600 To define the export options for the SCL file, select the Export Private Sections check box. The private sections data of the SCL file is only required by COM600 or MicroSCADA, not by CCT600.
  • Page 31: Importing The Scd File

    Section 5 1MRS757255 B GOOSE Open CCT600. To create an empty project, select File/Create New Project. Name the project. GUID-1B4325E3-7D15-4C92-A094-4128A5ECFC04 V1 EN Figure 7: Naming a project To select the destination folder for the project, click Browse. Click OK. After creating an empty project, import the SCD file from PCM600 to the project. 5.3.3 Importing the SCD file Import the SCD file from PCM600 to the empty project.
  • Page 32 Section 5 1MRS757255 B GOOSE GUID-C9CA5E07-9CE1-452C-8553-EF259BA0E999 V1 EN Figure 8: Importing an SCL file In Import SCL Data dialog box, clear the check boxes and click Browse for File. GUID-AF950D43-2962-4D40-9834-3EF5E26C246E V1 EN Figure 9: Browsing for an SCL file Locate the SCL file and click Open. Click Import File.
  • Page 33: Configuring A Goose Publisher

    Section 5 1MRS757255 B GOOSE If the substation includes third party IEDs which need to be configured for horizontal GOOSE communication, the SCL files holding the information from those IEDs must be imported as well. The third party IEDs have separate tools for creating the ICD/CID/ SCD file.
  • Page 34 Section 5 1MRS757255 B GOOSE GUID-D5AA23C7-F93C-449A-98A2-8E628E4B141E V1 EN Figure 10: Creating a data set in CCT600 To add a new data set, click Add in the Data Sets window. Give the data set an unique name. To define several data sets under the logical node LLN0, give the data sets unique names.
  • Page 35: Configuring A Goose Control Block

    A full list of the available signals with descriptions and IEC 61850 names is available in a file in the connectivity package installation directory, such as C:\Program Files\ABB \Connectivity Packages\eCB\Input Files \Documentation\EN\IEC \RBX615_Parameters_1MRS757106A.htm After defining the data attributes for the data sets, configure the GOOSE control block properties.
  • Page 36 Section 5 1MRS757255 B GOOSE Open the Project Navigator and select LD0/LLN0 in the submenu under the configured IED. In the IEC 61850 Data Engineering window on the right, select the GOOSE Control Engineering tab. GUID-6153694B-ED46-459D-B4B5-DEA54DF5466C V1 EN Figure 12: GOOSE control block basic properties Click Add/GSE Control.
  • Page 37 Section 5 1MRS757255 B GOOSE GUID-800B53C2-9EA1-448E-9785-7750740EBBB7 V1 EN Figure 13: Defining GOOSE control block address The IEC 61850 GSE Applications dialog box shows all the GOOSE control blocks of the active project. In this dialog box, all the GOOSE control block addresses in a project can be edited, and it can be ensured that several GOOSE control blocks are not using the same addresses.
  • Page 38: Configuring A Goose Subscriber

    Section 5 1MRS757255 B GOOSE GUID-DF37270F-6836-4C5D-A883-D8300DD930D1 V1 EN Figure 14: Updated address properties for the new GOOSE control block 5.3.5 Configuring a GOOSE subscriber A 615 series IED application can receive and use single binary, double binary, integer and floating point values with attached quality information. A quality attribute is received and processed automatically.
  • Page 39 Section 5 1MRS757255 B GOOSE GUID-28FD832E-DE8C-49B4-8065-39491F80EBAD V1 EN Figure 16: Updating data flow After the update, the GOOSE inputs are shown in Project Navigator submenu under LD0/LLN0/Inputs in the receiving IED. GUID-B20F09F5-0917-4990-8AF3-002B2D875B8C V1 EN Figure 17: GOOSE inputs show under the Inputs submenu. Repeat the drag-and-drop operation for every IED receiving data from the selected GOOSE control block.
  • Page 40: Finalizing Goose Configuration

    Section 5 1MRS757255 B GOOSE GUID-CD8CF7D5-18A7-460C-8AAD-60DB73F9DBCB V1 EN Figure 18: Confirming a GOOSE input deletion To update the data flow, select Tools/IEC61850 Data Flow Engineering/ Update DataFlow. 5.3.6 Finalizing GOOSE configuration 5.3.6.1 Exporting the SCL file Click Tools/SCL Import/Export/Export SCL File. GUID-52150B11-1100-4D0F-83F4-6E44BECEC7BF V1 EN Figure 19: Exporting an SCD file...
  • Page 41: Importing The Scl File

    Section 5 1MRS757255 B GOOSE GUID-B51B58F3-5602-4BAB-A74C-18883F4185DD V1 EN Figure 20: SCL export options Click Export. 5.3.6.2 Importing the SCL file Open PCM600. Go to the Project Explorer view and select the Plant Structure tab. Right-click the project and select Import. Breaker Integrated Protection RBX615 Engineering Guide...
  • Page 42 Section 5 1MRS757255 B GOOSE GUID-5F218874-7FC1-42CE-B5D3-9B6C9B6F6DDE V1 EN Figure 21: Importing an SCD file to PCM600 Open the SCL file exported from CCT600. In the SCL Import Options dialog box under IED Types, select Don't import IEDs of unknown type if the GOOSE configuration does not include third party devices.
  • Page 43: Connecting Goose Inputs To An Ied Application

    Section 5 1MRS757255 B GOOSE GUID-534860DB-532D-4941-BDB4-154F1C732D00 V1 EN Figure 22: SCL import options in PCM600 Click Import. For more information, see PCM600 documentation. 5.3.6.3 Connecting GOOSE inputs to an IED application In PCM600, open the Project Explorer and select the Plant Structure tab. Add the GOOSERCV function block by using Application Configuration Tool.
  • Page 44 Section 5 1MRS757255 B GOOSE GUID-29D8DFB6-A78A-4697-A318-A7CC751DFA3E V2 EN Figure 23: Adding the GOOSERCV function block Create the connection into the application. To open the Signal Matrix Tool, right-click the IED, and select Signal Matrix. To map the input points to the receiving input data, click the cell. To expand the source field, click the edge of the field and expand it until the whole GOOSE source address is visible.
  • Page 45: Received Goose Message Handling

    Section 5 1MRS757255 B GOOSE incorporated in the application with the status value, and it is not displayed in Signal Matrix Tool. Received GOOSE message handling A GOOSE frame is not accepted if the Needs Commission bit is set. A frame with the Test bit set is only accepted if the receiving IED is also in the test mode.
  • Page 46: Default Value Handling

    Section 5 1MRS757255 B GOOSE If no frames are received during 2xTAL, that is, if at least two consecutive frames are lost, the receiver defines the quality of the whole received data set as "bad" and sets the input value to the default, that is, to fail-safe. Consider this when designing the application.
  • Page 47 Section 5 1MRS757255 B GOOSE Table 6: Diagnostics data objects Data object Description Diagnostics information Intln1 Received messages When increasing, the IED is receiving GOOSE messages. Intln2 Transmitted messages When increasing, the IED is sending GOOSE messages. Intln3 Received state changes Received GOOSE messages with a new stNum value.
  • Page 48 Section 5 1MRS757255 B GOOSE GUID-261D823E-C0F6-44D3-AEA4-A3F3BC447107 V1 EN Figure 25: Receiving GOOSE data in 615 series IEDs Breaker Integrated Protection RBX615 Engineering Guide...
  • Page 49: Section 6 Required Cct600 Project Modifications

    Section 6 1MRS757255 B Required CCT600 project modifications Section 6 Required CCT600 project modifications When the IED configurations are changed using CCT600, some preparations are required when starting a project and importing the 615 series IED data model to the tool for the first time.
  • Page 50 Section 6 1MRS757255 B Required CCT600 project modifications GUID-71C407CB-E8C5-4DF4-8F93-745C068B45D9 V1 EN Figure 26: Defining bus connection properties for IEC 61850 clients Repeat the procedure for all five clients of the project. Breaker Integrated Protection RBX615 Engineering Guide...
  • Page 51: Defining Server Ieds

    Section 6 1MRS757255 B Required CCT600 project modifications The IEDs' bus connections are ready-made when the configuration work is started and need not to be set separately. In the Tools menu, change the user level to "Expert". Open the IED's Properties window and check that all the DataFlowGeneration options have the value TRUE before the first SCL export from the CCT600 project.
  • Page 52 Section 6 1MRS757255 B Required CCT600 project modifications GUID-D509B9C0-2D87-4DAC-AAC5-4F63E7E62AD9 V1 EN Figure 28: Defining server IEDs in CCT600 Breaker Integrated Protection RBX615 Engineering Guide...
  • Page 53: Section 7 Glossary

    Section 7 1MRS757255 B Glossary Section 7 Glossary 615 series Series of numerical IEDs for low-end protection and supervision applications of utility substations, and industrial switchgear and equipment 802.1Q The IEEE standard for VLAN trunking ACSI Abstract communication service interface APPID Application identifier CCT600...
  • Page 54 Section 7 1MRS757255 B Glossary Logical device zero (0) Light-emitting diode LHMI Local human-machine interface LLN0 Logical node zero (0) MicroSCADA Substation automation system Manufacturing message specification; Metering management system Multicast address An identifier for a group of hosts that have joined a multicast group Medium voltage PCM600...
  • Page 56 Contact us ABB S.p.A. Power Products Division Unità Operativa Sace-MV Via Friuli, 4 I-24044 Dalmine, Italy Phone +39 035 6952 111 +39 035 6952 874 E-Mail sacetms.tipm@it.abb.com www.abb.com ABB Oy Distribution Automation P.O. Box 699 FI-65101 VAASA, Finland Phone +358 10 22 11 +358 10 22 41094 www.abb.com/substationautomation...