AESYS TurboFire II Installation, Operation And Maintenance Manual page 17

Advertisement

Have
the
persons
listed
below been notified of
the
burner start-up
date?
0
Owner's Representative?
0
Mechanical Contractor's
Representative?
0
Electrical
Contractor's
Representative?
0
Service
Organization's
Representative?
0
York-Shipley
Representative?
Is
all specified auxiliary equipment mounted and
wired?
This may include
outdoor temperature
controls,
oil flow switches, space thermostats,
water
flow
switches, motorized
combustion
air
louvers,
etc.
0
GAS FIRING
Are
all gas train components
installed
and have they been
properly selected, sized and assembled?
0
Have properly sized
vent
lines been installed on all gas train
components
which
require venting? This
includes
such items as pressure regulators,
normally
open
vent
valves,
diaphragm
valves,
low
and
high
gas pressure
switches,
etc.
0
Have gas
train
piping
and components
been tested and
proven gas
tight?_ 0
Have the gas
lines
been purged?
0
Is the proper gas pressure available at the
inlet
to
the controls which
meets the
requirement
shown on
the
burner material
list?
0
OIL FIRING
Is the oil tank
installed
and
filled
with
the
proper
type and
grade of fuel oil as required by the burner
material
list? - - - - - - -
0
Is
the proper
oil pressure,
temperature and
viscosity
available
at
the
inlet
to
the
controls which meets
the
requirements
shown
on the
burner fire
test
report
and/or oil
system
sheet?
_ _ _ _ _ _
__
0
Have
oil supply
and
return
lines
been
properly
sized to meet
the maximum pumping capacity of the pump and has the
system
been
purged
and
proven
leak
proof? - - - - - - - - - - - -
--
0
Section 5 • Start-up
13