Download Print this page

AESYS TurboFire II Installation, Operation And Maintenance Manual page 11

Advertisement

8.
Remove any
rust, scale,
rope
or
refractory
left in
the firing tube or the front
mounting
flange
area with
a
wire
brush. Figure
3
"Preparing Mounting
Flange Area.·
9.
Inspect the
refractory
orifice located inside
the
firing tube.
The orifice
should
be
replaced
if
there
are
any
loose or
cracked bricks. Figure 4 "Refractory Target."
Fig ure
3.
Preparing Mounting
Flange Area
Figure
4.
Refract ory
Target
NOTE: THE
TURBOFIRE®
II BURNER NORMALLY REQUIRES
A
REFRACTORY
ORIFICE IN
THE
BOILER
MORISON
TUBE. CONSULT THE FACTORY
REPRESENTATIVE FOR THE
PROPER
SIZE AND INSTALLATION
INSTRUCTIONS.
WA RNIN
G
:
Do
not operate your Turbofire® II
without
a properly sized boiler orifice.
Unsafe
burner operation
will
result
Section
4
-
Installation
7

Advertisement

loading

Related Products for AESYS TurboFire II