Download Print this page

AESYS TurboFire II Installation, Operation And Maintenance Manual page 19

Advertisement

S
TAR~UP
PROCEDURE
STEP
1:
Tighten
all
electrical,
conduit,
air, steam and fuel lines.
STEP
2:
Set
the
natural
gas line pressure
taken
at the
beginning
of the
gas train
to
the
value
listed
in
the
burner
fire
test report, by
adjusting
the
natural
gas regulator.
Figure
9 "Pressure Tap on Gas Train"
Connect
manometer
to gas
pressure
tap.
Place
oxygen analyzer in boiler
stack.
FI.StiOLE TV&ING
Figure
9.
Pre9'Sure
Tap
on Gas
Train
STEP
3:
Read the Fireye
E100,
(or
YS-7000
if
so
equipped)
Flame Control
Manual
NOTE:
THE FIREYE E100
OR Y-S
7000
SYSTEM,
WHICH
IS
USED
ON YOUR
TURBOFIRE®
II
BURNER,
PROVI
DES
FLAME
SUPERVISION
AND
SEQUENCING
FUNCTIONS.
YOU
SHOULD BE THOROUGHLY
FAMI
LIAR
WITH ALL
OF THEIR
FUNCTIONS
AND
FEATURES BEFORE
ATTEMPTING
THE START-UP
PROCEDURE.
STEP
4:
Tum on electrical
power
to
the
boiler
at the main boiler room
electric
panel.
Section
5
-
Start-up
15

Advertisement

loading