Download Print this page

AESYS TurboFire II Installation, Operation And Maintenance Manual page 13

Advertisement

1
1.
Rotate the burner
in
the
lifting sling so that the air
inlet
of the blower
is
square to
the
floor. Rgure 7 "Burner Orientation and
Insertion."
NOTE:
THE BOILER
DESIGN
MAY REQUIRE THE
TURBOFIRE® II
BURNER
TO BE
INSTALLED
WITH THE BLOWER ABOVE THE
BURNER.
CONSULT FACTORY
REPRESENTATIVE.
12.
liberally spray adhesive onto
the front
mounting flange area of
t
he
boiler.
Wait
a few
moments
until the
adhesive
becomes
"tacky".
Wrap 3/8"
gasketing rope
around
the
circumference of the
firing tube two (2) times
on the inside of
the mountinq
stud
diameter on
the
front cover of the
boiler.
NOTE:
DO
NOT
USE
FIBERGLASS GASKET
13.
Slide the burner end head
into the firing tube of the
boiler. Rotate the burner
so
that
the
mounting flange
holes
of the
burner are
aligned
with the
mounting studs of the
boiler and slide
the
burner onto the studs. Rgure 7.
518'
OIAMETEf\
STAAWASHER
5.9.
NUT
(BRASS)
Figure
7.
Burner
Orientation
and Insertion
Section
4. -
Installation
9

Advertisement

loading