Husqvarna DC 900 Operator's Manual page 13

Table of Contents

Advertisement

Available languages

Available languages

b) For more suction power, increase the opening.
To discard a full BigBag and install a
new BigBag bag
WARNING:
caution. Use lifting equipment. A full BigBag
can be heavy. Make sure that the straps are
closed correctly before you lift the BigBag.
WARNING:
protection when you replace the BigBag.
Personal protective equipment on
Refer to
page 6 .
1. Stop the motor for the rotating valves.
2. Remove the funnels of the BigBag from the dust
outlets and close them.
3. Remove the pallet and the BigBag from the product.
4. Obey local regulations for disposal of the full BigBag
bag.
5. Put a new pallet and new BigBag below the product.
2154 - 002 - 25.10.2023
Lift the BigBag with
Use approved respiratory
6. Install the funnels of the BigBag (A) on the dust
outlets (B).
B
C
A
7. Attach the funnels of the BigBag on the dust outlets
with straps (C).
8. Make sure that the BigBag sits evenly on the pallet.
9. Start the motor for the rotating valves.
To drain the water from the pressure
tank
Water in the pressurized air collects in the pressure
tank. It is necessary to drain the water from the pressure
tank daily.
1. Stop the product. Refer to
page 12 .
To stop the product on
13

Advertisement

Table of Contents
loading

Table of Contents