INITIAL STARTUP

6.1

General Advice

6.2

Requirements at the application site

 VIRTUS 2023, All rights reserved
All work related to start-up may only be carried out by trained
specialist personnel.
Check the machine for possible transportation damage or
other damage. Should you determine damage, have this
confirmed by the freight company and please report this to us
in writing immediately after delivery. When starting up for the
first time and after setting up ready for service, you must
carry out the necessary checks according to the chapter
Machine Check prior to Initial Start-up.
The site of application for the machine must exhibit the following
features:
Enclosed space.
The ground must exhibit sufficient load-bearing capacity (you
can find the machine weight in the Chapter Technical Data).
The unevenness of the ground surface may not exceed 5 mm.
The machine must be freely accessible from all sides.
There must be sufficient room available for operating and
service personnel.
Spatial requirements: see Assembly drawing. All hinged parts
must be able to be opened completely.
Vibration-free environment.
The application site must be well-lit.
The machine may not be exposed to direct radiation caused by
radiators or the sun.
Room temperature: +5° to +40°C
Relative atmospheric humidity according to DIN 40040:
15 to 70 % (indoor)
By humidity levels higher than 70 %, apply anticorrosive
agent to the metallic-finished machine parts. Insulation for the
tropics is also necessary.
The machine may not be operated within range of static
discharges or strong magnetic fields as this could lead to faults
in the machine control system.