Product Installation - TP-Link SG6654X Installation Manual

Stackable l3 managed switch
Table of Contents

Advertisement

Omada Stackable L3 Managed Switch
2.4

Product Installation

The switch is designed with front-to-back heat dissipation feature. When it works, the air circulates
as shown below. For better heat dissipation, please install the device in a well-ventilated environment
and leave 5 to 10 cm gaps around the device.
Figure 2-1
Air Circulation
Desktop Installation
To install the device on the desktop, follow the steps:
1. Set the device on a flat surface which is strong enough to support the entire weight of the device
with all fittings.
2. Remove the adhesive backing papers from the rubber feet.
3. Turnover the device and attach the supplied rubber feet to the recessed areas on the bottom at
each corner of the device.
Figure 2-2
Desktop Installation
Rack Installation
The package includes 4 pairs of different rack-mounting brackets, their pictures are depicted below
and may differ from the actual products.
Figure 2-3
Mounting Brackets
12
Installation
Bracket A
Bracket B
Bracket C
Bracket D
Notch
Screw Hole
Group 2
Screw Hole
Group 1
Screw Hole
Group 3
Feet
Bottom of the Device

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg6654xhpSg6428xSg6428xhp

Table of Contents