Installation Tools; Product Installation - TP-Link Omada SG3210X-M2 Installation Manual

Hide thumbs Also See for Omada SG3210X-M2:
Table of Contents

Advertisement

Omada L2+ Managed Switch
enough to damage electronic devices, more effective lightning protection measures should be
taken.
Ensure that the rack and the device are well earthed.
Make sure the power socket has a good contact with the ground.
Keep a reasonable cabling system and avoid induced lightning.
Use the signal SPD (Surge Protective Device) when wiring outdoor.
Note:
For detailed lightning protection measures, go to https://www.tp-link.com/support, search the
model number of your switch and go to the product Support web page, refer to the Lightning
Protection Guide from the Related Documents:
https://www.tp-link.com/us/configuration-guides/lightning_protection_guide/.
Installation Site
When installing the device on a rack or a flat workbench, attach much importance to the following
items:
The rack or workbench is flat, stable, and sturdy enough to support the weight of 5.5 kg at least.
The rack or workbench has a good ventilation system. The equipment room is well ventilated.
The rack is well grounded. Keep the device less than 1.5 meters away from the power socket.
2.3

Installation Tools

Phillips screwdriver
ESD-preventive wrist wrap
Cables
Note:
These tools are not included with our product. If needed, you can purchase them separately.
2.4

Product Installation

Desktop Installation
To install the device on the desktop, follow the steps:
1. Set the device on a flat surface which is strong enough to support the entire weight of the device
with all fittings.
2. Remove the adhesive backing papers from the rubber feet.
08
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Omada sg3210xhp-m2Omada sg3218xp-m2

Table of Contents