TP-Link SG6654X Installation Manual page 19

Stackable l3 managed switch
Table of Contents

Advertisement

Figure 2-7
Installing Switch on Racks
Caution:
Leave 5 to 10 cm gaps around the devices for air circulation.
Avoid placing heavy things on the device.
Mount devices in the order demonstrated above and ensure a certain clearance between
devices for the purpose of heat dissipation.
Omada Stackable L3 Managed Switch
Installation
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg6654xhpSg6428xSg6428xhp

Table of Contents