Replacing An Insulation Monitoring Instrument - Huawei PDU8000 User Manual

Dc combiner cabinet
Hide thumbs Also See for PDU8000:
Table of Contents

Advertisement

PDU8000 DC Combiner Cabinet
User Manual

8.7 Replacing an Insulation Monitoring Instrument

Prerequisites
When replacing an insulation monitoring instrument, wear insulated gloves and
do not touch the copper bar.
Procedure
Step 1 Open the front door of the combiner cabinet.
Step 2 Loosen the screws on the protective panel of the insulation monitoring instrument
and open the protective panel.
Take appropriate insulation measures to avoid electric shocks when opening the
protective panel.
Step 3 Disconnect the PSU fuses FU11 and FU12 and check that the power indicator is
off.
Step 4 Remove the wiring terminals from the insulation monitoring instrument.
Step 5 Remove the insulation monitoring instrument.
1.
2.
Issue 02 (2022-08-10)
CA UTION
Tools: electroprobe, insulated gloves, Phillips screwdriver, multimeter, step
ladder, key to the combiner cabinet door
Material: A new insulation monitoring instrument of the same model is
available and functional.
NO TICE
Remove the screws that secure the sheet metal of the insulation monitoring
instrument, and remove the instrument and its sheet metal.
Remove the screws that secure the insulation monitoring instrument and take
off the instrument.
Copyright © Huawei Digital Power Technologies Co., Ltd.
8 Component Replacement
60

Advertisement

Table of Contents
loading

Table of Contents