Startup/Shutdown Procedure
6
6.1 Check before startup/shutdown Procedure
Check follwing this steps after installtion
No.
Items
1
The inverter is firmly installed
2
There is enough heat dissipation space,no external objects or parts left on the
inverter
3
It is convenient for operation and maintenance.
4
The wiring of the system is correct and firm
5
Check whether the DC and AC connection are correct with a multimeter,and
whether there is a short circuit, break, or wrong connection.
6
Check whether the waterproof nuts of rach part are tightened
7
The vacant port has been sealed.
8
All safety labels and warnig labels on the inverter are complete without occulusion
or alteration
6.2 Startup Procedure
Startup procedure following the procedures :
27