Download Print this page

Toro 131-2814 Installation Instructions Manual page 5

Exhaust kit rt1200 traction unit

Advertisement

Figure 10
5. Remove the flange clamp that secures the flange of the
turbocharger-exhaust pipe to the outlet flange of the
turbocharger and remove the exhaust pipe from the
machine
(Figure
11).
Note: Retain the flange clamp for installation
in
Installing the Turbocharger-Exhaust Pipe and
Pipe-Alignment Jig (page
turbocharger-exhaust pipe.
Figure 11
1. Flange
(turbocharger-exhaust
pipe)
2. Nut (flange clamp)
6); discard the old
3. Flange (turbocharger
outlet)
4
Preparing the
Turbocharger-Exhaust Pipe
No Parts Required
Preparing the Muffler
1. Clean the exterior surface of the inlet pipe for the
muffler
(Figure
12).
1. Inlet pipe (muffler)
2. Apply a light coat of high-temperature, anti-galling
compound to the exterior surface of the muffler-inlet
pipe.
5
Installing the
Turbocharger-Exhaust Pipe
Parts needed for this procedure:
1
Bellows-alignment jig
1
Turbocharger-exhaust pipe
1
Pipe-alignment jig
Installing the Bellows-Alignment Jig
1. Align the bellows-alignment jig to the new
turbocharger-exhaust pipe with the short tab of the jig
below the bellows
5
Figure 12
(Figure
13).

Advertisement

loading