Charging Details; Charging In Progress - WEG WEMOB-STATION-CCS-30kW Series Installation And Operation Manual

Table of Contents

Advertisement

After disconnecting the charging cable from the electric vehicle, the station will return to the start status,
with solid GREEN indication. The connector will be available for the next charging process.
NOTE!
When the electric vehicle is completely charged, insert the plug into the socket located on the side
of the station. Do not leave the charging cable on the floor.

7.3 CHARGING DETAILS

The following images show detailed information on the direct current (DC) charging process using the CCS-
2 connector.

7.3.1 Charging in Progress

Connector 2 – CCS – Type 2
1
2
3
Go to start
menu 60 s...
Figure 44: Screen with details of the charging in progress (example 150 kW)
1 - Displays data of the charging in progress on the selected connector. In this example, connector 2, CCS
Type 2 direct current (DC) charging connector, whose maximum power supplied is 60 kW;
2 - Displays the energy supplied to the vehicle so far, in kWh;
3 - Displays the present power supplied to the vehicle, in kW;
4 - Displays the percentage level of battery charge;
5 - Displays information on the other connectors (not available for the CCS only model);
6 - Displays the elapsed charging time.
– Max. 150 kw
Energy
200 kWh
Current
power
48,9
kW
6
Connector 1
Charging time
Type 2
00:10:00
Connector 3
CHAdeMO
80%
Stop
WEMOB-STATION | 49
Operation
Busy
5
Unavailable
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Station ccs-2 30 kw

Table of Contents