• Strictly follow the installation, operation, and configuration instructions in this guide. The manufacturer shall not be liable for equipment damage or personal injury if you do not follow the instructions. For more warranty details, please visit https://www.goodwe.com/support- service/warranty-related Safety Disclaimer...
Product: 1. PE cable of the inverter must be connected firmly. Make sure that all the grounding points on the enclosures are equipotential connected when there are multiple inverters. 2. Do not apply mechanical load to the terminals, otherwise the terminals can be damaged. 3.
EU Declaration of Conformity GoodWe Technologies Co., Ltd. hereby declares that the inverter with wireless communication modules sold in the European market meets the requirements of the following directives: • Radio Equipment Directive 2014/53/EU (RED) • Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS) •...
[1] DC switch reset button 1 controls DC switch 1-3, DC switch reset button 2 controls DC switch 4-6, DC switch reset button 3 controls DC switch 7-9, DC switch reset button 4 controls DC switch 10-12, DC switch reset button 5 controls DC switch 13-15. [2] Only for GW320K-UT.
Page 8
Space Requirements Children no touch ≥600mm ≥50mm ≥600mm ≥600mm 200mm ≥1000mm ≥600mm ALT: 5000m IP66 0%~100%RH Angle Requirements...
Page 9
Space Requirements • Horizontal Installation ≥800mm • Triangle Installation ≥200mm ≥500mm • Back-to-back Installation Do not place anything that will block the heat sink of the two inverter. ≥200mm Assembling the mounting plate 1.5-2N·m...
Page 10
Installing the mounting bracket Wall mounting The M10 expansion bolts should be prepared by customers. Bracket mounting Installing the Inverter Lifting the Inverter Weight...
Page 11
2~3N·m Hoisting the Inverter Weight 2~3N·m...
Electrical Connection Recomended dimensions of the copper to aluminum wiring terminal and rubber wall: 12mm 112mm 48mm PE Cable L=L1+(1~2)mm L1 7~9N·m...
Page 13
AC Cable Opening the AC wiring box 2.5~3N·m Multi-core AC cable 14-16mm 33-35mm 38-40mm 18-20mm > 300mm 22-24mm 43-45mm 26-28mm 53-55mm L2=L1+3mm 26-28mm 63-65mm 26-28mm 73-75mm L1 L2 L3 25~30N·m 7~9N·m...
Page 14
Single-core AC cable 14-16mm 18-20mm 18-20mm 22-24mm L2=L1+3mm 30-32mm 26-28mm 26-28mm 22-24mm 36-38mm 26-28mm 25~30N·m 7~9N·m Closing the AC wiring box L1 L2 L3 2.5~3N·m 200mm...
Communication Module Power ON and OFF Inverter Utility Transformer AC Switch Grid PV String DC Switch Power OFF Power ON Turn off Turn on...
Page 19
<5m SolarGo app Monitoring via SEMS Portal App play SEMS Portal App Store SEMS Portal APP For more detailed instructions, scan the QR code below. WiFi Quick SolarGo SEMS Portal UT Series User Installation Guide User Manual User Manual Manual...
Page 20
Official Website GoodWe Technologies Co.,Ltd. No. 90 Zijin Rd., New District, Suzhou, 215011, China www.goodwe.com service@goodwe.com Local Contacts 340-00931-00...
Need help?
Do you have a question about the UT Series and is the answer not in the manual?
Questions and answers