Cooling Piping Locations - Floor Units Only - Modine Manufacturing VFV Series Installation And Service Manual

Floor and ceiling mounted unit ventilator
Table of Contents

Advertisement

COOLING PIPING LOCATIONS - FLOOR UNITS ONLY

Figure 23.1 - Chilled Water Coil with or without Option-
al Reheat Coil
j Condensate drain connection located in right end compartment.
Note:

All dimensions shown on this page are in inches and are for reference only. For dimensions in mm, multiply inches by 25.4.
CHILLED WATER - WITH PIPING PACKAGE
Figure 23.2 - Chilled Water Coil with Pre-Heat Coil
j Condensate drain connection located in right end compartment.
14-500.7
23

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VFV Series and is the answer not in the manual?

Table of Contents