EX Controller Installation Guide
INSTALLATION CHECKLIST
TASK
Network information available and recorded in site log.
Location requirements verified.
Site power Voltage
Installation site pre-power check completed.
Mounting tools and equipment available.
Additional equipment available.
EX Controller received.
Quick start guide received.
Regulatory compliance and safety information received.
Warranty card received.
Software version verified.
Rack, desktop mounting of chassis completed.
Initial electrical connections established.
Cable length limits verified.
Initial configuration performed.
Initial operation verified.
8
VERIFIED BY
DATE