7 | Electrical connection
7.8 Function test of the trigger unit INT69 G
Before commissioning, after troubleshooting or making changes to the control power circuit, check
the functionality of the trigger unit. Perform this check using a continuity tester or gauge.
Gauge state
Deactivated state
INT69 G switch-on
Remove PTC connector
Insert PTC connector
Reset after mains on
7.9 Electronic trigger unit INT69 G at HC and LG compressors
The supplied INT69 G must be connected according to the wiring diagram shown here in a separate
control cabinet, which must be installed outside each danger zone.
ATTENTION Install heat protection thermostats and cold conductor motor
0
1
Schaltschrank
Switch cabinet
09
1
2
3
4
5
6
7
8
10 11 12
EB1
vio
bn
bu
gr
DELTA- P II
© Danfoss | Climate Solutions | 2023.06
Relay position
11-12
11-14
11-12
11-12
11-14
2
winding in series!
INT69G
13 20 21
BT1
BT2
BT2
BT2
og
pk
Relay position INT69 G
B2 12 14 11
3
4
BT1
Cold conductor (PTC
sensor) motor winding
BT2
Heat protection thermo-
stat (PTC sensor)
BT3
Oil temperature sensor
BT.3
EB1
Oil sump heater
Fig. 15
AQ452044031215en-000201 | 25
Fig. 14
5
6
D
GB
F
E
Need help?
Do you have a question about the BOCK HG44e and is the answer not in the manual?