Calorex I-PAC Series Owners & Installation Manual page 44

Inverter heat pumps
Hide thumbs Also See for I-PAC Series:
Table of Contents

Advertisement

OWNER/INSTALLATION MANUAL
Engineer
Date
Company
Engineer
Date
Company
Name and address of company operating plant.
1
Contact details of operator's nominated person responsible for F-Gas compliance.
2
Company and technician carrying out work, with details to provide evidence of compliance.
3
IMPORTANT The company carrying out refrigerant checking and removals, and the owner of the equipment need
to keep records for FIVE YEARS.
When this heat pump is decommissioned the refrigerant gas is to be recovered in accordance with current
environmental legislation.
44
Follow up actions
Name
Testing of automatic leak detection system (if fitted)
Name
Periods of non-use
Related to test on
Actions taken
Test result
Comments
1007929 ISSUE 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

I-pac 50/100blyI-pac 50/100bhc

Table of Contents