Install Als, If Ordered - Agilent Technologies 8860 Installation And First Startup

Gas chromatograph
Hide thumbs Also See for 8860:
Table of Contents

Advertisement

1
Installing the GC
Step 11 Install ALS, if ordered
If installing an ALS, install it now. Refer to its instructions.
Prepare the sampler for checkout. See the checkout procedures and information in the
Operation Manual.
1 Prepare a 2-mL screw-top sample vial with checkout sample.
2 Prepare 4-mL waste vials and place them into the turret.
3 Prepare fresh solvent solutions as needed for the checkout sample for your detector type.
40
Place the solvent vials into the injector turret. For details on the solvent needed, see the
Operation Manual:
Installation and First Startup

Advertisement

Table of Contents
loading

Table of Contents