Installing the GC

Install traps

1 Determine where you will install the traps in your supply tubing line.
Tank valve
Figure 9.
2 Cut the tubing to length with a tubing cutter.
3 Connect the traps and tubing. On/Off valves are not essential, but are very useful when a

Plumb to EPC flow modules

Inlet and detector EPC flow modules are mounted very close together across the back of the
GC. See
Detector EPCs
Figure 10.
Installation and First Startup
recommended trap order for the carrier gas and the recommended locations for On/Off
valves. Also see the Site Preparation Guide.
Gas Clean Filter
system
Gas supply
Plumb the gas supplies
tank or trap must be changed. (If purchasing Agilent compliance services, install an on/off
valve for each inlet gas supply.)
Figure
10.
Plumb flow modules
Two-stage regulator
On/Off valve
On/Off valve
Inlet EPCs