2 Pre-installation Instructions
V
ENTILATION
Adequate ventilation is required to ensure effective temperature control and system
longevity. Ensure that the underside and back of the instrument are free of obstruction
and receive sufficient air flow.
The air intake may gather dust and impede performance. The intake filter should be
inspected weekly and cleaned with a duster or compressed air, if necessary. If
extremely dirty, wash and dry overnight, especially if in a dirty environment.
AccuPyc III Pre-installation Instructions and Checklist
2 - 4
135-42870-01 (Rev -) — Nov 2023
Need help?
Do you have a question about the ACCUPYC III and is the answer not in the manual?