SECTION 3 Planning the installation of your evaporator (continued)
3.1.4

Preparing the location where the evaporator will be installed

You will be notified of the delivery date of your evaporator.
• Determine the exact location of the evaporator in the building.
• Before delivery date, make sure that all necessary work required for moving your evaporator to its final
location is completed.

3.2 RECEPTION INSPECTION

Here is a checklist to complete when you receive your evaporator.
3.2.1

Evaporator condition

• Check the condition of the evaporator as soon as it arrives.
• Although LAPIERRE EQUIPMENT applies rigorous quality control in the plant and before shipping, please
note, photograph and advise your LAPIERRE EQUIPMENT representative of any defects or imperfections
that may be observed on the day your equipment is received.
3.2.2

Purchase Order

• Have the purchase order on hand.
• Confirm by visual count that you have received all items such as concentrate, chimney and vent connectors
and all other items indicated on the purchase order.
• Also ensure that all items are in good condition.
3.2.3

Exact location of the evaporator in the building

Our staff will drop off the evaporator at the location you designate. It is important that the location is accurate.
Once on the ground, moving the evaporator is difficult and may cause damage to the evaporator and/or the
building.
Lapierre Equipment |
FUSION X
2
EVAPORATOR
| USER MANUAL | Version 01 - September 2022
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

F5F5 turbo

Table of Contents