SDD100 Dizzy disc Technical information sheet REV 03 Dizzy disc Code: SDD100 Sheet 1 of 3 The site must be level to maintain critical dimensions. AREA 9M² HIC 1 Foundations for wet pour/tiles Foundations for bark/sand Spirit level Timber wedge...
Page 2
Safety surface recommended 9.0 m based on 1.65 m from the center of the equipment (HIC 1M) Length of the safety perimeter 11m. Parts list Item Description Qty. Stock No. Dizzy disk assy SDD100 Required tools: Tape measure Spirit level Digging implements Wedge...
Page 3
SDD100 Dizzy disc Maintenance Instructions REV 03 Recommended Regular Inspection and Maintenance Interval (days) Check stability of structure, tighten connections if required. Check all uprights at ground level for corrosion and/or rot. Replace any defective parts. Check all painted elements for damage, rub down and repaint or replace as required.