Schematic, PCB Layout, and Bill of Materials

3
Schematic, PCB Layout, and Bill of Materials
3.1

Schematic

Figure 2
shows the complete schematic of the INA253Ax test board. The functional pins are accessed
through test points. The IS+ and IS– pins are shorted to VIN+ and VIN– using 0-Ω resistors, respectively.
The reference pins are in the split supply configuration through installed 0-Ω resistors Rx03 and Rx06.
VS1
TP108
GND1
VS1
GND1
6
INA253EVM
T101
ISP1
TP101
TP104
VS1
9
C102
16
0.1µF
C104
18
19
0.1µF
20
R101
GND1
17
0
R103
11
0
10
R104
0
6
R105
8
0
12
R106
0
TP106
GND1
TP110
Figure 2. INA253Ax Test Board Schematic
Copyright © 2018, Texas Instruments Incorporated
C103
1
INN1
0.1µF
U101
VS
5
IN+
IN-
1
IS+
IS–
2
IS+
IS–
3
IS+
IS–
4
SH+
SH-
REF1
13
REF2
OUT
7
NC
GND
14
NC
GND
15
NC
GND
INA253A1IPWR
GND1
www.ti.com
T102
ISN1
TP102
TP105
C105
0.1µF
R102
GND1
0
TP107
TP103
TP109
SBOU194 – May 2018
Submit Documentation Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INA253EVM and is the answer not in the manual?

Questions and answers

Table of Contents