www.ti.com
3.3
Bill of Materials
Table 3
lists the bill of materials (BOM) for the INA253EVM.
Quantity
Designator
3
C102, C202, C302
H13, H14, H15,
4
R101, R102, R103,
R106, R201, R202,
12
R203, R206, R301,
R302, R303, R306
TP101, TP102,
TP103, TP108,
TP109, TP201,
TP202, TP203,
15
TP208, TP209,
TP301, TP302,
TP303, TP308,
1
1
1
SBOU194 – May 2018
Submit Documentation Feedback
Table 3. Bill of Materials
Description
CAP, CERM, 0.1 µF, 16 V, +/- 10%,
X7R, 0402
Bumpon, Hemisphere, 0.375 X 0.235,
H16
Black
RES, 0, 5%, 0.063 W, 0402
Test Point, Compact, SMT
TP309
Low- or High-Side, Bidirectional, Zero-
Drift, Current-Shunt Monitor with
U101
Integrated Precision Low Inductive
Shunt Resistor, PW0020A (TSSOP-20)
Low- or High-Side, Bidirectional, Zero-
Drift, Current-Shunt Monitor with
U201
Integrated Precision Low Inductive
Shunt Resistor, PW0020A (TSSOP-20)
Low- or High-Side, Bidirectional, Zero-
Drift, Current-Shunt Monitor with
U301
Integrated Precision Low Inductive
Shunt Resistor, PW0020A (TSSOP-20)
Copyright © 2018, Texas Instruments Incorporated
Schematic, PCB Layout, and Bill of Materials
PartNumber
GRM155R71C104KA88D
SJ61A2
ERJ-2GE0R00X
5016
INA253A1IPWR
INA253A2IPWR
INA253A3IPWR
Manufacturer
MuRata
3M
Panasonic
Keystone
Texas Instruments
Texas Instruments
Texas Instruments
9
INA253EVM
Need help?
Do you have a question about the INA253EVM and is the answer not in the manual?