Foundation details 120º TOP VIEW FIG.1 NOTES: DRAWING OF 1 BENCH – DO the same in EACH GROUND LEVEL SOIL TIMBER SUPPORT POST CONCRETE pg 3 of 8 REF: CH112 - ZIG ZAG BEAM...
Page 4
Foundation details 90º TOP VIEW FIG.2 NOTES: DRAWING OF 1 BENCH – DO the same in EACH GROUND LEVEL SOIL TIMBER SUPPORT POST CONCRETE pg 4 of 8 REF: CH112 - ZIG ZAG BEAM...
Surfacing details = MINIMUM SPACE = SURFACING AREA NOTES: 120º SURFACING NOTES: 90º SURFACING pg 5 of 8 REF: CH112 - ZIG ZAG BEAM...
Page 6
Attach the preassembled BEAM to the Timbers (ZZ2) Using FM80 BRASS CREWS—ATTACH BEFORE LAYING CONCRETE FOUNDATIONS NOTES: Do THAT for ALL 3 BEAMS LAY CONCRETE FOUNDATIONS ENSURE: LAY CENTER BEAM BEFORE LEFT /RIGHT pg 6 of 8 REF: CH112 - ZIG ZAG BEAM...
Page 7
Assembly instructions Attach the LEFT/RIGHT BEAMS Using M12 120 cup square hex bolts / NYLOCS / END CAPS pg 7 of 8 REF: CH112 - ZIG ZAG BEAM...