Advertisement

Quick Links

WEAVING BEAM
Installation Instructions
REF: CH144 - WEAVING BEAM
pg 1 of 9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CH144 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Creative Play CH144

  • Page 1 WEAVING BEAM Installation Instructions REF: CH144 - WEAVING BEAM pg 1 of 9...
  • Page 2: Parts Required

    PARTS required (M12 Nylocs) (End Caps) (M12 thread bar @ 465mm) (M12 thread bar @ 370mm) (FM80 ‘Brass screws’) (left) (right) pg 2 of 9 REF: CH144 - WEAVING BEAM...
  • Page 3: Tools Required

    TOOLS required pg 3 of 9 REF: CH144 - WEAVING BEAM...
  • Page 4: Foundation Details

    Foundation Details FINISHED GROUND LEVEL SOIL TIMBER SUPPORT POST CONCRETE REF: CH144 - WEAVING BEAM pg 4 of 9...
  • Page 5: Surfacing Details

    Surfacing Details = MINIMUM SPACE = SURFACE AREA REF: CH144 - WEAVING BEAM pg 5 of 9...
  • Page 6 Assembly Instructions Attach the WB1 / 2 / 3 Timbers together at either end Using THREAD BAR (465mm) NYLOCS / END CAPS pg 6 of 9 REF: CH144 - WEAVING BEAM...
  • Page 7 Assembly Instructions Attach the remaining WB1 Timbers Using THREAD BAR (370mm) NYLOCS / END CAPS ENSURE END CAPS are used BOTH SIDES pg 7 of 9 REF: CH144 - WEAVING BEAM...
  • Page 8 Assembly Instructions Attach the six hex board FEET Using FM80 BRASS SCREWS All other fit are positioned @ 140mm ‘GAPS’ The FEET either end are positioned 90mm from the timber edge pg 8 of 9 REF: CH144 - WEAVING BEAM...
  • Page 9: Additional Drawings

    Additional Drawings pg 9 of 9 REF: CH144 - WEAVING BEAM...

Table of Contents