Parts required (PRE-ASSEMBLED ‘BEAM’ SECTION) (end caps) QTY x 4 (90mm x 90mm) ( Cap on top ) (EYEBOLT x 130 ) (QUICKLINK ) (Chain x 500mm) (M12 NYLOC) pg 2 of 7 REF: CH105 - MOVING BEAM...
Foundation details ENSURE: Distance between floor and beam - minimum 200mm GROUND LEVEL SOIL TIMBER SUPPORT POST CONCRETE pg 3 of 7 REF: CH105 - MOVING BEAM...
Surfacing details = MINIMUM SPACE = SURFACING AREA pg 4 of 7 REF: CH105 - MOVING BEAM...
Page 5
The holes are facing the correct direction Attach the Eyebolt to the Timber (MB1) Using NYLOCKS / END CAPS ENSURE: Ensure the eyebolt is as shown ABOVE / BELOW NOTES: REPEAT for the remaining posts pg 5 of 7 REF: CH105 - MOVING BEAM...
Page 6
Use LOCK TIGHT to ensure the quick link remains CLOSED NOTES: REPEAT for the remaining chains Attach the other END of the CHAIN to the BEAM ASSEMBLY using QUICKLINKS Use LOCK TIGHT to ensure the quick link remains CLOSED pg 6 of 7 REF: CH105 - MOVING BEAM...
Need help?
Do you have a question about the MOVING BEAM and is the answer not in the manual?
Questions and answers