Setup Checklist
Following are the steps needed to install a QuickJack. Perform them in the order shown.
☐
1. Review the Setup Safety Rules.
☐
2. Make sure you have the necessary Tools.
☐
3. Unpack the Components that came with the QuickJack. Verify all components are present.
☐
4. Read the About Thread Sealants section.
☐
5. Assemble the Short Hydraulic Hoses.
☐
6. Assemble the Long Hydraulic Hoses.
☐
7. STOP! Allow 24-Hours for the thread sealant to cure before applying pressure
to the Hydraulic System.
☐
8. Install the ORB Hydraulic Fitting on the Hydraulic Cylinders and Attach the Short Hose.
☐
9. Select a Setup Site.
☐
10. Verify there are adequate Clearances on all sides, above the vehicle and access to electrical
power.
☐
11. Locate the Auxiliary Pneumatic Springs and the Hydraulic Cylinders.
☐
12. Pressurize the Pneumatic Springs (50 psi / 3.4 bar max.)
☐
13. Install the Hydraulic Fittings on the Power Unit.
☐
14. Find a location for the Power Unit that allows an unobstructed view of both frames
while lifting.
☐
15. Fill the Hydraulic Fluid Reservoir.
☐
16. Check the Breather Valve.
☐
17. Lubricate Quick-Connect Fittings.
☐
18. Connect the Long Hydraulic Hoses between the Power Unit and the Short Hoses on each
Cylinder.
☐
19. Connect the Power Unit to a Power Source.
☐
20. Bleed the Hydraulic Cylinders.
☐
21. Review the Final Checklist.
☐
22. Test the QuickJack.
☐
23. Leave the Manual for the owner/operator.
QuickJack™ Portable Car Jack
14
P/N 5900263 — Rev. B6 —September 2023