5. Screw the wastecatcher square bars into the previously inserted wastecatcher holder rods, (Fig. 4-5)
putting the supplied screws through the largest drilling in the square bar, so that the head of the screw
sits flush within the bar itself. (Fig. 4-6)
Fig. 4-5
6. Position the main trimmer assembly on top of the floor stand. And properly align the bolt holes. Use
bolts (M8x55) to attach the main trimmer assembly to the floor stand. (Fig. 4-7)
Fig. 4-7
Fig. 4-6
MyBinding.com
5500 NE Moore Court
Hillsboro, OR 97124
Toll Free: 1-800-944-4573
Local: 503-640-5920
9
RET Series