Installation; System Installation And Initialization; Safety Warnings; Air Flow - Nvidia Spectrum-4 SN5000 2U Hardware User Manual

Hide thumbs Also See for Spectrum-4 SN5000 2U:
Table of Contents

Advertisement

Installation

System Installation and Initialization

Installation and initialization of the system require attention to the mechanical, power, and thermal
precautions for rack-mounted equipment.
The rack mounting holes conform to the EIA-310 standard for 19-inch racks. Take
precautions to guarantee proper ventilation in order to maintain good airflow at ambient
temperature.
Unless otherwise specified, NVIDIA products are designed to work in an environmentally
controlled data center with low levels of gaseous and dust (particulate) contamination.
The operation environment should meet severity level G1 as per ISA 71.04 for gaseous
contamination and ISO 14644-1 class 8 for cleanliness level.
The installation procedure for the system involves the following phases:
Step
1
Follow the safety warnings
2
Pay attention to the air flow consideration within
the system and rack
3
Make sure that none of the package contents is
missing or damaged
4
Mount the system into a rack enclosure
5
Power on the system
6
Perform system bring-up
7
[Optional] FRU replacements

Safety Warnings

Prior to the installation, please review the
to all models.

Air Flow

NVIDIA systems are offered with two air flow patterns:
The SN5400 and SN5600 systems are currently offered with one airflow type only -
Connector side inlet to power side outlet. 
Procedure
Safety
Warnings. Note that some warnings may not apply
See
Safety Warnings
Air Flow
Package Contents
19" System Mounting Options
Initial Power On
System Bring-Up
FRU Replacements
9

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Spectrum-4 SN5000 2U and is the answer not in the manual?

Questions and answers

Table of Contents