QM9700 and QM9790 InfiniBand Switch Systems Quick
Installation Guide

Advertisement

loading
Need help?

Need help?

Do you have a question about the InfiniBand QM9700 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Nvidia InfiniBand QM9700

  • Page 1 QM9700 and QM9790 InfiniBand Switch Systems Quick Installation Guide...
  • Page 2 Table of contents Table of contents Installation and Con guration Installation and Con guration QM9700 and QM9790 InfiniBand Switch Systems Quick Installation Guide...
  • Page 3 Models: QM9700, QM9790 Pay Attention! At least two people are required to safely mount the system in the rack. All servers and systems in the rack should be planned with the air ow direction. All FRU components must have the same air ow direction. A mismatch in the air ow will a ect the heat dissipation.
  • Page 4 1 x Rail kit for 23.6-31.5” (600-800mm) racks 4 x Power cables – Type C14-C15 1 x Harness: RS232 2M cable – DB9 to RJ-45 (only in QM9700) 2 x Cable retainers 32 x OSFP thermal caps Quantity Item X2 (of each ”...
  • Page 5 Quantity Item – QM9700 and QM9790 InfiniBand Switch Systems Quick Installation Guide...
  • Page 6 Quantity Item – QM9700 and QM9790 InfiniBand Switch Systems Quick Installation Guide...
  • Page 7 Quantity Item If anything is damaged or missing, contact your NVIDIA representative at Networking- support@nvidia.com. QM9700 and QM9790 InfiniBand Switch Systems Quick Installation Guide...
  • Page 8 Installation and Con guration Installation Instructions Note The following steps include illustrations that show front side (ports) installation, yet all instructions apply to all installation options. # Illustration Extract the system rail (Part A): 1. Extract the system rail (Part A) from the rack rail (Part B). 2.
  • Page 9 # Illustration Install the rack rails (Part B) on the rack. 1. Mount both of the rack rails (Part B) into the rack by angularly inserting the brakes located at the rails edges into the designated slots in the rack unit.
  • Page 10 * It may take up to ve minutes to turn on the system. If the System Status LED shows amber after ve minutes, unplug the system and contact your NVIDIA representative. ** Certain systems have a single management port. QM9700 and QM9790 InfiniBand Switch Systems Quick Installation Guide...
  • Page 11 * It may take up to ve minutes to turn on the system. If the System Status LED shows red/amber after ve minutes, unplug the system and contact your NVIDIA representative. LED Assignments Symbol Description Normal Status System health Green/Flashing...
  • Page 12 Onyx (MLNX-OS) admin admin 4. Initial con guration in Onyx (MLNX-OS): Go through the con guration wizard. For further information, please refer to https://docs.nvidia.com/networking/software/switch-software/index.html. For full installation instructions, go to https://docs.nvidia.com/networking/display/QM97X0PUB. QM9700 and QM9790 InfiniBand Switch Systems Quick Installation Guide...
  • Page 13 NVIDIA accepts no liability related to any default, damage, costs, or problem which may be based on or attributable to: (i) the use of the NVIDIA product in any manner that is contrary to this document or (ii) customer product designs.
  • Page 14 EXPRESSLY DISCLAIMS ALL IMPLIED WARRANTIES OF NONINFRINGEMENT, MERCHANTABILITY, AND FITNESS FOR A PARTICULAR PURPOSE. TO THE EXTENT NOT PROHIBITED BY LAW, IN NO EVENT WILL NVIDIA BE LIABLE FOR ANY DAMAGES, INCLUDING WITHOUT LIMITATION ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, PUNITIVE, OR CONSEQUENTIAL DAMAGES, HOWEVER CAUSED AND REGARDLESS OF THE THEORY OF LIABILITY, ARISING OUT OF ANY USE OF THIS DOCUMENT, EVEN IF NVIDIA HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.