3-2-3 Cable connection
st
1. At 1
time to use the Full IP grade machine, the cables needs to be connected. All operation of
cable connection has to be on the dry and clean place. There are basically 2 cables necessarily, 1 is
power cable, another is signal cable.
The connectors and cables have a positioning pin (as the red circle below), please align the pin then
plug into the connectors. After plug in the cable, please rotate the front part (as the green part
below) to tight, do not rotate whole connector as there is wire inside.
2. All connectors comes with a cap and a label showing the signal for this connector.
On the cable side there is a tab also showing the functionality.