Wall Mounting - JVC TH-W513BK Instruction Manual

Table of Contents

Advertisement

Available languages

Available languages

Wall Mounting

• Installation must be carried out by qualified personnel only. Incorrect assembly can result in severe
personal injury and property damage (if you intend to install this product yourself, you must check
for installations such as electrical wiring and plumbing that may be buried inside the wall). It is the
installer's responsibility to verify that the wall will safely support the total load of the Soundbar and
wall brackets.
• Additional tools (not included) are required for the installation.
• Do not overtighten screws.
• Keep this instruction manual for future reference.
• Use an electronic stud finder to check the wall type before drilling and mounting.
1. Drill 4 parallel holes (Ø 3-8 mm each
according to wall type) in the wall.
The distance between the holes
should be 765 mm.
2. Firmly fix 1 dowel into each hole in
the wall if necessary.
3. Tighten the wall mount brackets on
the wall with screws and screwdriver
(not included). Make sure that they are
securely installed.
4. Loosen the screws at the back of the
unit for 2 mm. Lift the unit onto the
wall mount brackets and slot into
place.
765 mm
Dowel
765 mm
Loosen the screws
Solid wall (i.e., Solid brick,
Solid concrete, Solid wood,
Solid wooden battens)
Drywall, Plaster wall,
Lath wall, etc.
2 mm
11
GB

Advertisement

Table of Contents
loading

Table of Contents