General Texas Instruments High Voltage Evaluation (TI HV EVM) User Safety Guidelines
Always follow TI's setup and application instructions, including use of all interface components within their
recommended electrical rated voltage and power limits. Always use electrical safety precautions to help
ensure your personal safety and those working around you. Contact TI's Product Information Center
http://support/ti./com
Save all warnings and instructions for future reference.
Failure to follow warnings and instructions may result in personal injury,
property damage or death due to electrical shock and burn hazards.
The term TI HV EVM refers to an electronic device typically provided as an open framed, unenclosed
printed circuit board assembly. It is intended strictly for use in development laboratory environments,
solely for qualified professional users having training, expertise and knowledge of electrical safety risks in
development and application of high voltage electrical circuits. Any other use and/or application are strictly
prohibited by Texas Instruments. If you are not suitable qualified, you should immediately stop from further
use of the HV EVM.
1. Work Area Safety
a. Keep work area clean and orderly.
b. Qualified observer(s) must be present anytime circuits are energized.
c. Effective barriers and signage must be present in the area where the TI HV EVM and its interface
electronics are energized, indicating operation of accessible high voltages may be present, for the
purpose of protecting inadvertent access.
d. All interface circuits, power supplies, evaluation modules, instruments, meters, scopes and other
related apparatus used in a development environment exceeding 50Vrms/75VDC must be
electrically located within a protected Emergency Power Off EPO protected power strip.
e. Use stable and nonconductive work surface.
f. Use adequately insulated clamps and wires to attach measurement probes and instruments. No
freehand testing whenever possible.
2. Electrical Safety
As a precautionary measure, it is always a good engineering practice to assume that the entire EVM
may have fully accessible and active high voltages.
a. De-energize the TI HV EVM and all its inputs, outputs and electrical loads before performing any
electrical or other diagnostic measurements. Revalidate that TI HV EVM power has been safely
de-energized.
b. With the EVM confirmed de-energized, proceed with required electrical circuit configurations,
wiring, measurement equipment connection, and other application needs, while still assuming the
EVM circuit and measuring instruments are electrically live.
c. After EVM readiness is complete, energize the EVM as intended.
While the EVM is energized, never touch the EVM or its electrical
circuits, as they could be at high voltages capable of causing electrical
shock hazard.
SBVU065 – May 2020
Submit Documentation Feedback
General Texas Instruments High Voltage Evaluation (TI HV EVM) User Safety Guidelines
for further information.
WARNING
WARNING
Copyright © 2020, Texas Instruments Incorporated
WARNING
MLTLDO2EVM-037 Evaluation Module
3
Need help?
Do you have a question about the MLTLDO2EVM-037 and is the answer not in the manual?
Questions and answers