Bill of Materials

5
Bill of Materials
Table 1
shows the BOM for this EVM.
Designator
QTY
Value
!PCB1
1
C7, C18, C29, C38
4
C8, C9, C19, C20, C30, C31,
8
0.1 µF
C39, C40
C10, C21, C32, C41
4
10 µF
C23
1
0.01 µF
C44
1
0.01 µF
H9, H10, H11, H12
4
J1, J2, J11, J12, J21, J22, J30,
8
J31
J3, J6, J14, J17, J25, J26, J33,
8
J36
J7
1
J8, J9, J18, J19, J27, J28, J37,
8
J38
J13, J32
2
R1, R25
2
R3, R24
2
10.0 kΩ
R7, R27
2
1.0 Meg
SH-J1, SH-J2
2
TP1, TP2, TP3, TP4, TP5, TP6,
30
TP7, TP8, TP9, TP10, TP11,
TP12, TP13, TP14, TP15, TP16,
TP17, TP18, TP19, TP20, TP21,
TP22, TP23, TP24, TP25, TP26,
TP27, TP28, TP29, TP30
C1, C12
0
0.1 µF
(1)
These assemblies are ESD sensitive, observe ESD precautions.
(2)
These assemblies must be clean and free from flux and all contaminants. Use of no-clean flux is not acceptable.
(3)
These assemblies must comply with workmanship standards IPC-A-610 Class 2.
(4)
Unless otherwise noted in the Alternate Part Number or Alternate Manufacturer columns, all parts can be substituted with equivalents.
20
MLTLDO2EVM-037 Evaluation Module
Table 1. MLTLDO2EVM-037 BOM
Description
Printed Circuit Board
1 µF
CAP, CERM, 1 µF, 100 V, ±10%, X7R, 1210
CAP, CERM, 0.1 µF, 100 V, ±10%, X7R,
AEC-Q200 Grade 1, 0805
CAP, CERM, 10 µF, 50 V, ±20%, X7R, 1210
CAP, CERM, 0.01 µF, 100 V, ±10%, X7R,
0805
CAP, CERM, 0.01 µF, 100 V,±10%, X7R,
0603
Bumpon, Hemisphere, 0.44 X 0.20, Clear
Standard Banana Jack, Insulated, Red
Terminal Block, 5 mm, 2 × 1, Tin, TH
Header, 2.54 mm, 2 × 1, Tin, TH
Standard Banana Jack, Insulated, Black
Header, 2.54 mm, 3 × 1, Gold, TH
0
RES, 0, 1%, 0.5 W, 0805
RES, 10.0 k, 1%, 0.125 W, AEC-Q200 Grade
0, 0805
RES, 1.0 M, 5%, 0.125 W, AEC-Q200 Grade
0, 0805
1 × 2
Shunt, 100 mil, Gold plated, Black
Test Point, Compact, SMT
CAP, CERM, 0.1 µF, 100 V, ±10%, X7R,
0805
Copyright © 2020, Texas Instruments Incorporated
(1) (2) (3) (4)
Package Reference
Part Number
LP037
1210
C3225X7R2A105K200AA
0805
CGA4J2X7R2A104K125AA
1210
C3225X7R1H106M250AC
0805
08051C103KAT2A
0603
885012206114
Transparent Bumpon
SJ-5303 (CLEAR)
6091
6091
Terminal Block, 5 mm,
691 101 710 002
2 × 1, TH
Header, 2.54 mm, 2 ×
TSW-102-23-T-S
1, TH
6092
6092
Header, 2.54 mm, 3 ×
61300311121
1, TH
0805
5106
0805
CRCW080510K0FKEA
0805
ERJ-6GEYJ105V
Shunt
SNT-100-BK-G
Testpoint_Keystone_Co
5016
mpact
0805
GRM21BR72A104KAC4L
www.ti.com
Manufacturer
Alternate
Alternate
Part Number
Manufacturer
Any
TDK
TDK
TDK
AVX
Wurth Elektronik
3M
Keystone
Wurth Elektronik
Samtec
Keystone
Wurth Elektronik
Keystone
Vishay-Dale
Panasonic
Samtec
969102-0000-DA
3M
Keystone
MuRata
SBVU065 – May 2020
Submit Documentation Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MLTLDO2EVM-037 and is the answer not in the manual?

Questions and answers

Table of Contents