Designator
QTY
Value
C2, C13, C24, C43
0
100 µF
C3, C4, C14, C15, C25, C26,
0
47 µF
C34, C35
C5, C16, C27, C36
0
100 µF
C6, C11, C17, C22, C28, C33,
0
C37, C42
D1, D2
0
100 V
FID1, FID2, FID3
0
H1, H2, H3, H4, H13, H14, H15,
0
H16, H21, H22, H23, H24, H29,
H30, H31, H32
H5, H6, H7, H8, H17, H18, H19,
0
H20, H25, H26, H27, H28, H33,
H34, H35, H36
J4, J5, J15, J16, J23, J24, J34,
0
J35
J10, J29
0
J20, J39
0
R2, R4, R26
0
10.0 kΩ
R5, R6, R8, R9, R10, R11, R12,
0
R13, R14, R15, R16, R17, R18,
R19, R20, R21, R22, R23
U1
0
U2
0
U3
0
U4
0
SBVU065 – May 2020
Submit Documentation Feedback
Table 1. MLTLDO2EVM-037 BOM
Description
CAP, AL, 100 µF, 100 V, ±20%, 0.17 ohm,
AEC-Q200 Grade 2, SMD
CAP, TA, 47 µF, 50 V, ±10%, 0.24 ohm,
SMD
CAP, AL, 100 µF, 35 V, ±20%, 0.2 ohm,
AEC-Q200 Grade 1, SMD
1 µF
CAP, CERM, 1 µF, 250 V, ±10%, X7R, 2220
Diode, Switching, 100 V, 0.15 A, SOD-123FL
Fiducial mark. There is nothing to buy or
mount.
Machine Screw, Round, #4-40 x 1/4, Nylon,
Philips panhead
Standoff, Hex, 0.5"L #4-40 Nylon
SMA Straight Jack, Gold, 50 Ohm, TH
Header, 2.54 mm, 3 × 2, Gold, TH
Header, 2.54 mm, 5 × 2, Gold, TH
RES, 10.0 k, 1%, 0.125 W, AEC-Q200 Grade
0, 0805
0
RES, 0, 1%, 0.5 W, 0805
Most LDOs in the DCY package
Most LDOs in the DRV package
Most LDOs in the DQN package
Most LDOs in the SOT-23 package
Copyright © 2020, Texas Instruments Incorporated
(1) (2) (3) (4)
(continued)
Package Reference
Part Number
SMT Radial J16
EEV-FK2A101M
6.2 × 6 mm
597D476X9050Z2T
D8 × L10.2 mm
EEE-TC1V101P
2220
GRM55DR72E105KW01L
SOD-123FL
1N4148WFL-G3-08
N/A
N/A
Screw
NY PMS 440 0025 PH
Standoff
1902C
SMA Straight Jack, TH
901-144-8RFX
Header, 2.54 mm, 3 ×
61300621121
2, TH
Header, 2.54 mm, 5 ×
61301021121
2, TH
0805
CRCW080510K0FKEA
0805
5106
DCY0004A
SOIC8
KVU0003A
KVU0005A
Bill of Materials
Manufacturer
Alternate
Alternate
Part Number
Manufacturer
Panasonic
Vishay-Sprague
Panasonic
MuRata
Vishay-
Semiconductor
N/A
B&F Fastener
Supply
Keystone
Amphenol RF
Wurth Elektronik
Wurth Elektronik
Vishay-Dale
Keystone
Texas Instruments
Texas Instruments
Texas Instruments
Texas Instruments
MLTLDO2EVM-037 Evaluation Module
21

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MLTLDO2EVM-037 and is the answer not in the manual?

Questions and answers

Table of Contents