6.3 Mains connection

Power is supplied via the external mains adapter. The stated voltage value must be
the same as the local voltage.
Only use original KERN mains adapters. Using other makes requires consent by
KERN.

6.4 Battery operation

On the rear side of the display unit remove the battery cover and connect 6 x 1.5V
mignon cells. Reinsert the battery cover.
In order to save the battery, the balance switches automatically off after 3 minutes
without weighing. Further shutdown times can be set in the Menu (Function
"A.OFF"), see Section 9.
If the batteries are exhausted, the battery symbol will appear (see chap. 2.1). Switch-
off balance and replace batteries at once.
If the balance is not used for a longer time, take out the batteries and store them
separately. Leaking battery liquid could damage the balance.

6.5 Initial Commissioning

In order to obtain exact results with the electronic balances, your balance must have
reached the operating temperature (see warming up time chap. 1). During this
warming up time the balance must be connected to the power supply (mains,
accumulator or battery).
The accuracy of the balance depends on the local acceleration of gravity.
Strictly observe hints in chapter Adjustment.