MOUNTING AND CONNECTING THE BURNER
Packing
The burners are despatched in wooden crates whose dimensions are:
2100 X 1370 X H 1060 mm (Dimensions are indicative.)
burner with detached gas train;
gasket or ceramic fibre plait (according to burner type) to be inserted between the burner
and the boiler;
envelope containing this manual and other documents.
To get rid of the burner's packing, follow the procedures laid down by current laws on disposal
of materials.
Handling the burner
WARNING! The handling operations must be carried out by specialised and
trained personnel. If these operations are not carried out correctly, the resi-
dual risk for the burner to overturn and fall down still persists.
The burner is provided with eyebolts, for handling operations.
Duo-block burner orientation.
Fitting the burner to the boiler
To perform the installation, proceed as follows:
1
drill the furnace plateas decribed in paragraph ("Overall dimensions");
2
place the burner towards the furnace plate: lift and move the burner by means of its eyebolts placed on the top side (see"Lifting and
moving the burner");
3
screw the stud bolts (5) in the plate holes, according to the burner's drilling plate described on paragraph "Overall dimensions";
4
place the ceramic fibre rope on the burner flange (if necessary, use a spray adhesive on the flange).
5
install the burner into the boiler;
6
fix the burner to the stud bolts, by means of the fixing nuts, according to the picture below.
7
After fitting the burner to the boiler, ensure that the gap between the blast tube and the refractory lining is sealed with appropriate
PART II: INSTALLATION
13
PART II: INSTALLATION
H
P
Eyebolts
Duo-block burner orientation to be
specified at the order.