80 Ton Right Hand Unit
1. Place evaporators at their final location.
2. Start by attaching compressor spacer to evaporator
first.
3. Secure with intelleclamps.
30
4. Unbraze caps from both evaporator and compressor
first. Line up compressor A piping to the corresponding
evaporator holes.
5. Push compressor A into evaporator.
6. Secure compressor A to spacer with intelleclamps.