Installation Checklist - Dacor DOP48M96D Installation Instructions Manual

Modernist pro range
Hide thumbs Also See for DOP48M96D:
Table of Contents

Advertisement

Installation
Instal
lation Instruction

Installation Checklist

WARNING
The installer should complete this checklist to ensure thorough, proper installation.
Proper installation is the responsibility of the homeowner.
Was the plastic sheeting peeled off the range exterior?
Was all packaging removed from the oven chamber?
Do all leveling legs contact the floor? Is the unit level? (Pg. 27.)
Was the range secured with the anti-tip bracket and foot as instructed? (Pgs. 20 – 23.)
Was the gas-supply inlet pressure measured to ensure it does not exceed the maximums
stated in these instructions. (Pg. 18.)
Is the range connected to the gas supply as instructed and according to applicable codes? Was
the gas supply checked for leaks? Was the regulator cover re-installed? (Pg. 25 – 27.)
Is the oven door installed as instructed? (Pg. 28 – 29.)
Were the burner knobs properly installed? (Pg. 29.)
Are the burners (Pg. 30 – 32) and grates (Pg. 33) installed as instructed?
Was proper operation verified?
Was the warranty activated online or the warranty card filled out and mailed?
Instructions s
English
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dop36m94dDop48c96dls

Table of Contents