Download Print this page

Aquadart onisa8 Installation Instructions Manual

Sliding door enclosure

Advertisement

Quick Links

Sliding Door Enclosure
INSTALLATION INSTRUCTIONS
Please read through the complete instruction leaflet before commencing any installation work!
This product should be installed by a suitably qualified and proficient person. The fitting instructions should be
followed carefully to ensure a proper and safe installation. Failure to follow these instructions could result in future
injury.
These instructions and list of parts assume that installation is done against solid/tiled walls.
Please check this product for damage prior to starting the installation. No claims can be made after the product has
been fitted.
PLEASE NOTE :The minimum and maximum adjustment sizes noted on the product brochures are based on
perfectly plumb walls and trays.
www.aquadart.co.uk
Tools Required
6
2.75
PH2 TYPE

Advertisement

loading
Need help?

Need help?

Do you have a question about the onisa8 and is the answer not in the manual?

Questions and answers

Summary of Contents for Aquadart onisa8

  • Page 1 Sliding Door Enclosure INSTALLATION INSTRUCTIONS www.aquadart.co.uk Please read through the complete instruction leaflet before commencing any installation work! Tools Required 2.75 PH2 TYPE This product should be installed by a suitably qualified and proficient person. The fitting instructions should be followed carefully to ensure a proper and safe installation.
  • Page 2 COMPONENTS AND BOX CONTENTS Side Panel Package Sliding Door Package 19-2 19-1 Box Contents Sliding Door Package Box Contents Side Panel Package Description Image Q'ty Description Image Q'ty Description Image Q'ty Corner Post Rail End Fixing L/R Top Roller Wall Plugs Screw ST 3.5X20 Bottom Roller Side Panel Glass...
  • Page 3 IMPORTANT - Missing Components Please check this product for missing components prior to installation. For spare parts visit ww w.aquadart.co.uk IMPORTANT - Installation site 1. Ensure the top surface of the shower tray on which the enclosure will be installed is level in every direction.
  • Page 4: Installation Instructions

    Sliding Door Enclosure INSTALLATION INSTRUCTIONS Note: The product can be constructed either way up, for left or right hand opening.This instruction is showing a RIGHT hand opening. If the door is being fitted with a Side Panel please follow this instruction to complete installation. Step 1.1 Place the side panel wall profile (9.2mm glass groove) (no 37) and sliding door wall profile (7.2mm glass...
  • Page 5 INSTALLATION INSTRUCTIONS Step 3.1 Fit the corner post holder (no.38) onto the bolt fixed on the bottom rail, use the first hole on the holder. (Diagram K). Step 3.2 Insert the correct hand of the washer (no.27) into the corner post from the bottom.
  • Page 6 INSTALLATION INSTRUCTIONS Step 5.1 Ensure the holes on the fixed panel line up the holes on the rail profile and fixing strip.Insert the rail fixing seal (no.13) into the top and bottom rail then secure the fixed panel and rail profile ST3.5x25 together using 4 screws M5x12 (no.14).
  • Page 7 INSTALLATION INSTRUCTIONS Step 8 Insert the roller stoppers (no.20) into the top and bottom rail from the end of the rail profile then secure it on to the rail profiles using the allen wrench to tighten the grub screws on the roller stopper then fit the cover cap on to cover the screws.Next fit the rail profile end caps (no.23/24) onto the top and...
  • Page 8 Riverside Business Park, Royd Ings Avenue, Keighley, West Yorkshire, BD21 4AF For technical/aftersales queries,please visit our website: www.aquadart.co.uk or Sales Tel: 01535 613830 Technical: 01535 613830 Fax: 01535 613831...